01.11.2014 Views

B-1 AGREEMENT System Generated e-Tender No ... - e-Tendering

B-1 AGREEMENT System Generated e-Tender No ... - e-Tendering

B-1 AGREEMENT System Generated e-Tender No ... - e-Tendering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

74 Dy. Executive Engineer<br />

Annexure 'B'<br />

Construction Material Testing & its frequency<br />

Sr. Material Rate Frequency<br />

1 CEMENT<br />

1) Consistency<br />

2) Initial & Final Setting time<br />

3) Fineness<br />

4) Specific Gravity<br />

5) Soundness<br />

6) Compressive Strength<br />

2 METAL<br />

a 1) Sieve Analysis (Gradation)<br />

(Concrete work)<br />

Test per 50 M.t. above six tests shall be<br />

carried.<br />

1 Test for every day work<br />

2) Sieve Analysis Red Book Specification 1 Test per 100 m3<br />

3) Sieve Analysis<br />

1 Test per 200 m3<br />

Granular Sub Base (N.H.Work) MOST<br />

b Water Absorption 1 Test per 200 m3<br />

c Impact (Concrete WBM/BT) 1 Test per 200 m3<br />

d Crushing 1 Test per for Each Source<br />

e Abrasion 1 Test per for Each Source<br />

f Flakiness & Elongation Index 1 Test per 200 m3<br />

g Plasticity Index for blindage used for WBM 1 Test per 25 m3<br />

3 SAND<br />

1) Water Absorption & Specific Gravity 1 Test per for Each Source<br />

4 BRICKS<br />

1) Water Absorption<br />

2) Comp Strength<br />

3) Effloresce<br />

5 Flooring Tiles<br />

1) Flexural Strength<br />

2) Water Absorption<br />

3) Abrasion<br />

6 Manglore tiles<br />

1) Water Absorption<br />

2) Breaking Load<br />

For each 50000 <strong>No</strong>s bricks Above three<br />

test are to be carried out<br />

For 2000 <strong>No</strong>s of Tiles above three tests<br />

are to be carried out<br />

1 Test- 6 Tiles per 50000 <strong>No</strong>s.<br />

2 Test- 6 Tiles per 50000 <strong>No</strong>s.<br />

7 Glazed Tiles<br />

1) Water Absorption 1 Test- 6 Tiles per 2000 <strong>No</strong>s.<br />

8 Concrete Mix Design 1 Concrete Mix Design for each<br />

Compressive strength C.C.Cubes for Qty<br />

Qty. utpo 5 m3<br />

6-15 m3 2 Set (3 <strong>No</strong>s)<br />

16-30 m3 3 Set (3 <strong>No</strong>s)<br />

31-50 m3 4 Set (3 <strong>No</strong>s)<br />

grade of concrete per every per hour<br />

1 Set (3 <strong>No</strong>s.)<br />

Quantity above 51 m3<br />

9 MURUM/ SOIL for earth work<br />

1) Optimum Dry Density 2 Test per 3000 m3<br />

2) C.B.R. 1 Test per 3000 m3<br />

3) Liquid & Plastic Limit/Plasticity Index 1 Test per 3000 m3<br />

4) Filed Density 100% P.D. 1 Test per 3000 m3<br />

5) Filed Moisture Content 1 Test per 3000 m3<br />

10 WOOD<br />

1) Moisture Content 1 test per Source<br />

2) Density 1 test per Source<br />

11 WATER<br />

1) P.H. Value for Water and Sand 1 test per Source<br />

2) Chloride & Sulphate content 2 test per Source<br />

12 Steel<br />

1) Wt per metre<br />

2) Ultimate Tensile Stress<br />

3) Yield stress<br />

4) Elogation<br />

4+1 additional set per 50 m3<br />

One test for every 5.0 MT or part thereof<br />

for each diametre<br />

Signature of Contractor <strong>No</strong>. Of Corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!