71 Dy. Executive Engineer<br />

b) The maximum size of aggregate permissible would be as per A-7 page-8 of Standard<br />

Specifications Book 1979 Edition.<br />

30.5 The items provided with watering for curing include continuous watering operations through<br />

out the day including lunch hours and also during holidays. For this purpose contractor shall<br />

have to construct tank of appro. 5000 liters capacity near each building and provide<br />

necessary Booster Pumps etc. to ensure adequate curing and wetting. Hold fasts coming in<br />

contact with R.C.C. columns shall be of sizes 30 cm x 4 cm to be fitted with two rows, nails<br />

fixed properly in concrete.<br />

30.6 For all sand covering items, use of washed mixer sand (with sand washing machine) is<br />

obligatory. <strong>No</strong> separate claim in this regard will be entertained.<br />

30.7 Material testing requirement frequency and type of testing is enclosed separately. Material to<br />

be used shall be tested accordingly and cost shall be borne by contractor.<br />

30.8 For R.C.C. centering plywood and M.S. sheet of approved quality shall be used and<br />

adjustable props and fasteners shall be used.<br />

30.9 The execution of any work from external side of the building 'H' frame steel scaffolding shall<br />

be used. <strong>No</strong> separate payment for claims in this regard shall be entertained.<br />

30.10 The scaffolding shall not be supported on existing external walls of the building by making<br />

holes in it and also the scaffolds shall not rest on any part of the building.<br />

31 Quality Assurance Manual: Contractor shall prepare the quality assurance manual booklet in<br />

consultation with the Executive Engineer. Quality assurance manual shall be comprehensive<br />

document covering every aspect of the work. Superintending Engineer shall approve this<br />

document. The quality manual document shall be used only after approval from<br />

Superintending Engineer. Provision of the quality manual be binding on the contractor. Quality<br />

manual shall be treated as a legal document as per with this contract document. It shall be<br />

used till the work is completed in full respect.<br />

32 ¿ÖÖÃÖ−Ö ˆ¤üμÖÖêÖ, ˆ•ÖÖÔ ¾Ö úÖ´ÖÖÖ¸ü ×¾Ö³ÖÖÖ ¯Ö¡Ö Îú.²ÖßÃÖß‹/‡´ÖÖ¸üŸÖ/2002/¯ÖÏ.Îú.108/úÖ´ÖÖÖ¸ü-7-†/´ÖÓ¡ÖÖ»ÖμÖ,<br />

´ÖãÓ²Ö‡Ô/פü.03/07/2010 ¾Ö ¿ÖÖÃÖ−Ö ÃÖÖ¾ÖÔ•Ö×−Öú ²ÖÖÓ¬ÖúÖ´Ö ×¾Ö³ÖÖÖ ´ÖÓ¡ÖÖ»ÖμÖ ´ÖãÓ²Ö‡Ô •ÖÖ.Îú.ÃÖÓ×úÖÔ/10/09/<br />

¯ÖÏ.Îú.277/ ‡´ÖÖ¸üŸÖß-2/פü.17/08/2010 †−¾ÖμÖê ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»μÖÖÖ ˆ¯Öú¸ü<br />

†×¬Ö×−ÖμÖ´Ö 1996 ´Ö¬Öᯙ ŸÖ¸üŸÖã¤üß“μÖÖ †−ÖãÂÖÓÖÖ−Öê 1 üŒúÖ ˆ¯Öú¸ü ÖÖ•ÖÖß ¾Ö ¿ÖÖÃÖ×úμÖ ²ÖÖÓ¬ÖúÖ´ÖÖ“μÖÖ ‹ãúÖ<br />

´Öã»μÖÖ−ÖãÃÖÖ¸ü (•Ö×´Ö−Öß“Öê ´Öã»μÖ ¾ÖÖôæ−Ö) ŸÖÃÖê“Ö ÃÖÓ²Ö¬ÖßŸÖ †ÖãÖÖ¯Ö−Öê−Öê úÖ´ÖÖÖ¸üÖÓ−ÖÖ Øú¾ÖÖ ŸμÖÖ“μÖÖ −ÖÖŸÖ»ÖÖÖÓ−ÖÖ<br />

úÖ´ÖÖÖÓ¸üÖÃÖÖšüß −ÖãúÃÖÖ−Ö ³Ö¸ü¯ÖÖ‡Ô †×¬Ö×−ÖμÖ´Ö 1923 ´Ö¬Öᯙ ŸÖ¸üŸÖæ¤üß−ÖãÃÖÖ¸ü úÖêÖŸμÖÖÆüß ¯ÖÏúÖ¸ü“Öß ³Ö¸ü¯ÖÖ‡Ô<br />

פü»Öê»Öß †ÃÖê»Ö ŸÖß ¸üŒú´Ö ¾ÖÖôæû−Ö ˆ¾ÖÔ¸üßŸÖ ²ÖÖÓ¬ÖúÖ´Ö ´Öã»μÖÖ−ÖãÃÖÖ¸ü 1 üŒúÖ ˆ¯Öú¸ü ¾ÖÃÖã»Ö ú¸üμÖÖŸÖ μÖê‡Ô»Ö.<br />

Signature of Contractor <strong>No</strong>. Of Corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!