SCHEDULE “B”<br />
NAME OF WORK:-<br />
Construction of Warehouse of 3000 Metric Tonne Capacity (2 <strong>No</strong>s) at Chikhale, in Taluka Dahanu, District Thane.<br />
Sr.<br />
<strong>No</strong>.<br />
Quantity<br />
Estimated<br />
but may be<br />
more or less<br />
Description of Item<br />
In Figures<br />
Estimated Rates<br />
(In Rupees)<br />
In Words<br />
Unit Per<br />
Total Amount<br />
according to<br />
estimated<br />
quantities<br />
(In Rupees)<br />
1 2 3 4 5 6 7<br />
1 1219.00<br />
One Cubic 140855.45<br />
Cubic Metre<br />
Metre<br />
2 64.15<br />
Cubic Metre<br />
3 1466.48<br />
Cubic Metre<br />
4 630.74<br />
Cubic metre<br />
Item <strong>No</strong>. 1:- Excavation for foundation in earth, soils of all types,<br />
sand gravel and soft murum including removing the excavated<br />
materials upto a distance of 50 metres beyond the building area<br />
and all lift, stacking and spreading, necessary dewatering unless<br />
provided elsewhere, preparing the bed for foundation and required<br />
backfilling, ramming, watering, shoring and strutting etc. complete<br />
as directed.<br />
Item <strong>No</strong>. 2:- Excavation for foundation in hard rock by blasting / old<br />
cement / lime masonry foundation including removing the<br />
excavated materials upto a distance of 50 metres beyond the<br />
building area and all lift, stacking and spreading, necessary<br />
dewatering unless provided elsewhere, preparing the bed for<br />
foundation and required backfilling, ramming, watering, shoring and<br />
strutting etc. complete as directed.<br />
Item <strong>No</strong>. 3:- Providing soling using 80 millimetre size trap metal in<br />
layers of 15 centimetre each including filling voids with sand,<br />
ramming, watering etc. complete<br />
Item <strong>No</strong>. 4:- Providing and laying in situ cement concrete in<br />
proportion M-15 of trap metal for foundation and bedding, including<br />
bailing out water manually, formwork, compacting and curing etc.<br />
complete.<br />
115.55 Rupees one hundred<br />
fifteen and paise fiftyfive<br />
only<br />
505.50 Rupees five hundred<br />
five and paise fifty only<br />
1439.35 Rupees one thousand<br />
four hundred thirty-nine<br />
and paise thirty-five<br />
only<br />
5644.00 Rupees five thousand<br />
six hundred forty-four<br />
and paise nil only<br />
One Cubic<br />
Metre<br />
One Cubic<br />
Metre<br />
One Cubic<br />
Metre<br />
32427.83<br />
2110777.99<br />
3559896.56<br />
101<br />
Signature Of Contractor <strong>No</strong>. Of Corrections Executive Engineer<br />
P.W. Division, Jawhar