(B) FORMULA FOR MATERIALS COMPONENT :<br />
88 Dy. Executive Engineer<br />
Where,<br />
V 2 = 0.85 P X K 2 x M 1 - M 0<br />
100 M 0<br />
V 2 = Amount of price variation in Rupees to be allowed for Materials component.<br />
P = Same as worked out for Labour component.<br />
K 2 = Percentage of Materials Component as indicated above.<br />
M 0 = Basic wholesale Price Index shall be average wholesale price index for the quarter<br />
preceding the month in which the last date prescribed for receipt of tender falls.<br />
M 1 = Average wholesale Price Index during the quarter under consideration.<br />
(C) FORMULA FOR PETROL, OIL AND LUBRICANT COMPONENT :<br />
Where,<br />
V 3 = 0.85 P X K 3 x P 1 - P 0<br />
100 P 0<br />
V 3 = Amount of price variation in Rupees to be allowed for POL component.<br />
P = Same as worked out for Labour component.<br />
K 3 = Percentage of Petrol, Oil & Lubricant Component.<br />
P 0 = Average price of H.S.D. at Mumbai during the quarter preceding the month in which<br />
the last date prescribed for receipt of tender falls.<br />
P 1 = Average price of H.S.D. at Mumbai during the quarter under consideration.<br />
(D) FORMULA FOR BITUMEN COMPONENT :<br />
Where,<br />
V 4 = QB (B 1 - B 0 )<br />
V 4 = Amount of price variation in Rupees to be allowed for Bitumen component.<br />
QB = Quantity of bitumen (Grade 30/40 & 60/70) in metric tones used in the permanent<br />
works and approved enabling works during the qurter under consideration.<br />
B 1 = Current, average ex-refinery price per metric tonne of Bitumen (Grade 30/40 &<br />
Grade 60/40) under consideration including taxes (octroi, excise, sales tax) during the<br />
quarter under consideration.<br />
B 0 = Basic rate of Bitumen in rupees per metric tonne as considered for working out value<br />
of P. or average ex-refinery price in rupees per metric tonne including taxes (octroi,<br />
excise sales tax) of bitumen for the grade of bitumen under consideration prevailing<br />
quarter preceding the month in which the last date prescribe for receipt of tender,<br />
falls, whichever is higher.<br />
(E) FORMULA FOR T.M.T. STEEL COMPONENT :<br />
Where,<br />
V 5 = S 0 (Sl 1 - Sl 0 )<br />
---------------- x T<br />
Sl 0<br />
V 5 = Amount of price variation in Rupees to be allowed for T.M.T. Steel component.<br />
S 0 = Basic rate of T.M.T. Steel in rupees per metric tonne as considered for working out<br />
value of P.<br />
Sl 1 = Average Steel Index as per RBI Bulletin during the quarter under consideration.<br />
Sl 0 = Average of Steel Index as per RBI Bulletin for the quarter preceding the month in<br />
which the last date prescribed for receipt of tender falls.<br />
T = Tonnage of steel used in the permanent works for the quarter under consideration.<br />
Signature of Contractor <strong>No</strong>. Of Corrections Executive Engineer