78 Dy. Executive Engineer<br />
2. FROMWORK FOR CONCRETE WORK :- The forms of concrete shall be of the materials as<br />
directly by the Executive Engineer-in-charge and shall preferably be of steel or plywood,<br />
Forms shall be of the required shape, profile and lines. Suitable devices shall be used to hold<br />
corners, adjacent ends, edges of panel or other forms together in accurate alignment. The<br />
forms and joints shall tight enough. Forms used for circular curved or structures of unusual<br />
shape, petal dome etc. shall be of such a character that will result in smooth concrete surface<br />
and exact shape. They shall be prepared such that they will not warp or distort during erection<br />
or while placing concrete. Their design and layout shall be got approved form the Executive<br />
Engineer-in-charge in advance.<br />
3. ERECTION AND REMOVAL OF FORM WORK :- The centering and strutting shall be of<br />
steel or plywood board exclusively for concreting. The design and drawing should be got<br />
approved in advance from the Department. For minor members the Engineer-in-charge may,<br />
at his discretion, permit use of wooden shuttering. The centering and shuttering shall be close<br />
and tight to prevent leakage of cement slurry. The centering shall have the necessary props,<br />
bracing and edges sufficiently strong and stable which shall not yield or displace while or after<br />
laying of concrete. They shall be made in such way that they can be slackened and removed<br />
gradually and slowly without distributing the concrete. Centering and shuttering shall not be<br />
removed before the design strength is achieved.<br />
4. MIXTURE OF CONCRETE :- Design mix concrete as well as nominal mix concrete shall be<br />
mixed by following the provision in Standard specification at B. 6.4 unless otherwise directed<br />
by the Engineer.<br />
Unless otherwise agreed by the Engineer concrete shall be mixed in a batch type mixer of<br />
such other type of mixer as the Engineer my approve.<br />
During hot weather the Contractor shall ensure that the constituent materials are sufficiently<br />
cool to prevent the concrete from stiffening in the intervals between its discharge from the<br />
mixer and its final position.<br />
5. TRANSPORTATION, PLACING AND COMPACTION OF CONCRETE :- The method of<br />
transportation placing and compaction of concrete shall be followed as per section B.6.6, 6.7<br />
and 6.8 of Standard Specification unless otherwise directed by the Engineer. The compaction<br />
shall be done with surface float vibrators for slabs and with pin vibrators for columns and<br />
beams. Vibrators of adequate vibrating capacity shall be employed for all types of works.<br />
6. CURING :- Curing shall be done by following provision of Section B.6.9 of Standard<br />
Specification and as directed by the Engineer.<br />
7. WORKING IN EXTREME WEATHER : During windy weather sufficient protection shall be<br />
provided to prevent the cement from being blown away during the process of proportioning<br />
and mixing. During wet weather, the concrete shall be adequately protected as soon as it is<br />
placed in position.<br />
<strong>No</strong> concreting shall be carried out during period of continuous heavy rains unless, it is<br />
completely covered during mixing, transporting and placing, In extreme hot weather,<br />
concreting shall be restricted to morning and evenings The time between mixing and placing<br />
of concrete shall be kept to the minimum and formwork shall be cooled by sprinkling with<br />
water.<br />
8. FINISHING : Finishing work shall comply with requirement of section B.6.10 of Standard<br />
Specification unless otherwise specified herein below :<br />
Immediately on removal of forms, the R.C.C. work shall be examined by the Engineer before<br />
any defects are made good.<br />
a) The work that has sagged or contains honey combing to an extent detrimental to<br />
structural safety or architectural concept shall be rejected.<br />
b) Surface defects of a minor nature shall be rectified generally as indicated below by<br />
the contractor.<br />
Signature of Contractor <strong>No</strong>. Of Corrections Executive Engineer