65 Dy. Executive Engineer<br />
9.3 The Contractor shall duly comply with the provision of the Apprentices Act 1961 (iii of 1961)<br />
and the rules and orders made thereunder from time to time under the said Rules and on his<br />
failure or neglect to do so he shall be subject to all the liabilities and penalties provided by the<br />
said Act and Rules.<br />
9.4 It is presumed that the Contractor has gone carefully through the Standard Specification (Vol.<br />
I & II 1981 Edition) M.O.R.T. & H specifications (edition 2001) and Schedule of Rate of the<br />
division, and studied the site conditions before arriving at rates quoted by him. The special<br />
provisions and detailed specification of wording of any item shall gain precedence over the<br />
corresponding contrary provisions (if any) in the standard specification given without<br />
reproducing the details in contract. Decision of Engineer-in-charge shall be final in case of<br />
interpretation of specification.<br />
9.5 If the standard specifications fall short for the items quoted in the schedule of this contract<br />
reference shall be made to the latest Indian Standard specifications, I.R.C. codes. If any of<br />
items of this contract do not fall in reference quoted above, the decision and specifications as<br />
directed by the Engineer-in-charge shall be final.<br />
9.6 The stacking and storage of building materials at site shall be in such a manner as to prevent<br />
deterioration or inclusion of foreign materials and to ensure the preservation of the quantity,<br />
properties and fitness of the work. Suitable precautions shall be taken by Contractor to<br />
protect the materials against atmospheric action fire and other hazards. The materials likely<br />
to be carried away by wind shall be stored in suitable stores or with suitable barricades and<br />
where there is likelihood of subsidence of soil, heavy materials shall be stored on paved<br />
platforms. Suitable separating barricades and enclosure as directed shall be provided to<br />
separate materials brought by contractor and from different sources of supply.<br />
10. DEFINITIONS :<br />
Unless excluding by or repugnant to the context :-<br />
a) The expression "Government" as used in the tender documents shall mean the Public<br />
Works Department of the Government of Maharashtra.<br />
b) The expression "The Chief Engineer" as used anywhere in the tender papers shall mean<br />
officer for the time being of the Government of Maharashtra who is designated as such.<br />
c) The expression "Superintending Engineer" as used in the tender papers shall mean the<br />
officer of Superintending Engineer rank (by whatever designation he may be known) under<br />
whose control the work lies for the time being.<br />
d) The expression “Engineer” or “Engineer-In-Charge” as used in the tender papers shall<br />
mean the Executive Engineer-in-charge of the work.<br />
e) The expression "Contractor" as used in the tender papers shall mean the successful<br />
tenderer that is the tenderer whose tender has been accepted, and who has been authorised<br />
to proceed with the work.<br />
f) The expression "Contract" as used in the tender papers shall mean the deed of contract<br />
together with or its original accompaniment and those later incorporated in it by mutual<br />
consent.<br />
g) The expression "Plant" as used in the tender papers shall mean very temporary and<br />
necessary means necessary or considered necessary by the Engineer to execute, construct,<br />
complete and maintain the works and used in altered, modified, substituted and additional<br />
works ordered in the time and in the manner herein provided and all temporary materials and<br />
special and other articles of appliances of every sort, kind and description whatsoever<br />
intended or used therefor.<br />
h) The expression “Department” as used in the tender papers shall means Public Works<br />
Department of Government of Maharashtra.<br />
i) The “Accepting authority” shall mean the officer competent to accept the tender.<br />
j) The “Site” shall mean the land and/or other places where the work is to be executed under<br />
the contract including any other land or places which may be allotted by the Government or<br />
use for the purpose of contract.<br />
Signature of Contractor <strong>No</strong>. Of Corrections Executive Engineer