REWARI KANPUR PIPELINE<br />

PROJECT<br />

HIGH FREQUENCY ELECTRIC WELDED<br />

(HFW) LINE PIPE<br />

DOCUMENT NUMBER<br />

0068-00-SPC-2002<br />

Revision 0<br />

10.2.8 DIMENSIONAL TESTING<br />

10.2.8.7 The measuring equipment requiring calibration or verification under the provisions of<br />

(New) API Spec 5L shall be calibrated with manual instruments at least once per operating<br />

shift (12 hours maximum). Such calibration records shall be furnished to<br />

Purchaser’s Representative on request.<br />

10.2.10 NON-DESTRUCT<strong>IV</strong>E INSPECTION<br />

The Purchaser reserves the right to depute its Representative(s) to perform inspection<br />

and witness tests in all phases of manufacturing and testing starting from steel making to<br />

finished line pipe ready for shipment. Manufacturer shall <strong>com</strong>ply with the provisions<br />

regarding inspection notice, plant access, <strong>com</strong>pliance and rejection mentioned in this<br />

specification/API Spec 5L. The Manufacturer shall give the Purchaser reasonable notice<br />

of the starting date of normal production and the work schedule. Any action or omission<br />

on part of Purchaser's Representative shall not relieve the Manufacturer of his<br />

responsibility and obligation to supply material in strict accordance with this specification.<br />

10.2.11 SORTING AND REPROCESSING<br />

This Para stands cancelled.<br />

10.2.12 RETESTING<br />

10.2.12.3RECHECK ANALYSIS<br />

(New)<br />

Modalities of recheck analysis shall be as per API Spec. 5L as applicable to the lot being<br />

tested (refer Table-18 of this specification). However, during individual testing, each pipe<br />

shall be fully analysed to meet the requirements of Table 5 of this specification.<br />

10.2.12.4 CHARPY RETESTS<br />

(New)<br />

In the event that a set of Charpy test specimen fails to meet the acceptance criteria, the<br />

manufacturer may elect to replace the lot (refer Table-18 of this specification) of material<br />

involved or alternatively to test two more lengths from that lot. If both the new tests meet<br />

the acceptance criteria, then all pipes in that lot, with the exception of the original<br />

selected length, shall be considered to meet the requirement.<br />

11.0 MARKING<br />

11.1 GENERAL<br />

Marking specified in API Paragraphs and otherwise specified in the Purchase Order<br />

shall be in English language and International System (SI) of units. Marking shall<br />

<strong>com</strong>ply with API Spec 5L and as modified in this specification.<br />