REWARI KANPUR PIPELINE<br />

PROJECT<br />

SUBMERGED ARS WELDED HELICAL<br />

SEAM (SAWH) LINE PIPE<br />

DOCUMENT NUMBER<br />

0068-00-SPC-2003<br />

Revision 0<br />

G.3.4.2 The test specimens, testing procedure, and rating of the specimens shall be in<br />

accordance<br />

(New) with API RP 5L3. The type of notch (pressed or chevron) shall be selected by agreement<br />

between the manufacturer and the purchaser.<br />

G.3.4.3 At least 80% of the heats shall exhibit a fracture appearance shear area of 75% or more<br />

(New) for the specified test temperature.<br />

G.3.4.4 In the event the average value of the two specimens from the length selected to represent<br />

(New)<br />

the lot is less than 75%, the manufacturer may elect to establish the lot average by testing<br />

two specimens from each of two or more additional lengths of pipe in the lot. In<br />

establishing the new lot average, the manufacturer may elect (a) to employ the <strong>com</strong>bined<br />

average of the three tests or more; or (b) to discard the result of the first test, reject the<br />

pipe from which it was taken, and employ the <strong>com</strong>bined average of the two or more<br />

additional tests. Alternatively, the manufacturer may elect to test all the pipe in the lot, in<br />

which case 80% or more of the lengths tested and applied to the order shall exhibit an<br />

average of 75% or more shear.<br />

G.3.4.5 Specimens showing material defects or defective preparation, whether observed before or<br />

(New)<br />

after breaking, may be discarded, and replacements shall be considered as original<br />

specimens.<br />

G.3.4.6 The manufacturer shall be responsible for replacement of such heats as may be<br />

(New) necessary to meet the above requirements.<br />

G.4 TEST FREQUENCY<br />

G.4.1<br />

G.4.2<br />

This clause is cancelled.<br />

Frequency of CVN and DWT for D <br />

specification (Refer Table 18).<br />

G.6 GUIDANCE FOR DETERMINING CVN ABSORBED ENERGY VALUES IN BURIED<br />

ONSHORE GAS PIPELINES<br />

G.6.1<br />

This clause is also applicable for liquid or liquefied petroleum gas(LPG) pipelines.<br />

G.12 ADDITIONAL FRACTURE TOUGHNESS REQUIREMENTS (TRANSVERSE CHARPY<br />

V-NOTCH) FOR PSL2 PIPE.<br />

G.12.1 Fracture toughness testing shall be performed in accordance with the requirements of<br />

(New) para 10.2.4.3 and 10.2.1.2 of API Spec 5L and as modified in this specification, with a<br />

test temperature of 32°F (0°C) or at a lower temperature as specified in the Purchase<br />

Order. The required minimum all heat average full size absorbed energy value (based on<br />

a set of three specimens) for transverse body specimen shall be the greater of (a) and<br />

(b) given below.<br />

The required minimum average full size absorbed energy value for weld and HAZ<br />

specimen shall also be the greater of (a) and (b) given below. In addition, the lowest<br />

individual absorbed energy value of the three specimens shall not be less than 80% of the<br />

value specified.<br />

0068-FMT-01 Page 32 of 41<br />

Copyright L&T-GULF Private Limited. All rights reserved.