EPMC SERVICES FOR REWARI – KANPUR PIPELINE<br />

SPECIFICATION FOR PIPELINE CONSTRUCTION<br />

4.5.3 The above described additional depth ditching shall be known as "Normal Extra Depth Ditching",<br />

and no extra <strong>com</strong>pensation will be paid.<br />

4.5.4 OWNER may require CONTRACTOR to excavate the trench to additional depth to provide more<br />

cover than is required by "Normal Extra Depth Ditching" where the line crosses swamps or lands<br />

subjected to floods, where additional excavation is required to prevent freezing, to provide clearance<br />

for future installation of tile or drainage ditches, or where the right-of-way easement so requires. Such<br />

extra depth ditch shall be known as "Abnormal Extra Depth Ditch", and CONTRACTOR shall be<br />

<strong>com</strong>pensated the unit price set forth in the Proposal for "Abnormal Extra Depth Ditch". CONTRACTOR<br />

will not be <strong>com</strong>pensated for extra ditch unless 30 metres (100 feet) or more of continuous Abnormal<br />

Extra Depth Ditch is excavated.<br />

4.5.5 CONTRACTOR shall dig the trench to such additional depth necessary to lay the pipeline under<br />

any other pipelines or underground structures, except drain tile, with at least 1 foot ( 0.3 m) clearance.<br />

Where drain tile is encountered, CONTRACTOR shall dig the trench so that the pipeline may be laid<br />

under with a clearance of a minimum of 6 inches (15 cm). When any drain tile is damaged, cut or<br />

removed, it must be temporarily repaired immediately if necessary, at Contractor's expense. At the<br />

time such tile is damaged, the CONTRACTOR shall carefully and immediately mark the location of<br />

such damaged tile by means of a latch securely staked with a bright yellow flag attached thereto. Such<br />

markers shall be kept in place and shall not be removed except by the tile repair crew after tile has<br />

been repaired and such repairs have been inspected and approved by the landowner and the<br />

OWNER.<br />

4.5.6 No blasting shall be allowed without permission of OWNER, and prior notice to landowners,<br />

adjacent landowners and other interested parties. When blasting is necessary for trench excavations,<br />

precaution must be taken to minimize the danger or inconvenience to landowners and tenants along<br />

the line, to telephone lines or other above-ground structures, and to the Owner's or others' existing<br />

pipelines and other appurtenances. Extreme care shall be exercised so as not to scatter loose rock<br />

over the right-of-way and cultivated fields or cause damages to property. If loose rock is scattered,<br />

CONTRACTOR shall pick up such rock to the satisfaction of the landowner and the OWNER.<br />

4.5.7 OWNER desires to reduce to a minimum the required number of bends to lay the pipe to<br />

conform to the contour of the ground and maintain a normal covering. This ditch shall start sloping 100<br />

ft (30 metres) before approaching any road, railway crossing and small water courses and slope out in<br />

the same manner to obtain required depth. It is Owner's intention that the CONTRACTOR shall<br />

eliminate unnecessary bending by operating the ditching machine at various depths rather than by<br />

finishing grading the ditch by hand, whenever practicable.<br />

4.5.8 CONTRACTOR shall provide temporary crossings, wherever necessary, to permit property<br />

owner or his tenant to travel or move his stock and equipment from one point to another on his<br />

property.<br />

4.5.9 No payment will be made for over-excavation.<br />

n:\513-mh-2145-rkpl\11 engineering\11.8 pipelines\06 spec\specification for pipeline construction\mh2145-c000-<br />

pl-spc-0001.doc<br />

MH2145-C000-PL-SPC-0001 RevA Page 12 of 32