EPMC SERVICES FOR REWARI – KANPUR PIPELINE<br />

SPECIFICATION FOR CONCRETE WEIGHT COATING<br />

12. WEIGHING<br />

12.1 The test specimen shall be selected at equal intervals during the course of<br />

production.<br />

12.2 CONTRACTOR shall weigh each pipe when dry prior to shipment and 28 days after<br />

placing of concrete and mark the weight with paint on the inside of the pipe.<br />

n:\513-mh-2145-rkpl\11 engineering\11.8 pipelines\06 spec\specification for concrete weight coating\mh2145-<br />

c000-pl-spc-0014.doc<br />

MH2145-C000-PL-SPC-0014 RevA Page 18 of 23