EPMC SERVICES FOR REWARI – KANPUR PIPELINE<br />

SCOPE OF WORK–PIPELINE LAYING AND ASSOCIATED WORKS<br />

7.21.2 All lined canals having width more than 5m shall be installed through boring method only. All<br />

other unlined canals crossings shall be installed through open cut in consultation with<br />

concerned authorities.<br />

No damage should be caused to any irrigation sources, while laying the pipeline through canal<br />

crossings. The banks of the /Canal should be brought to the original condition. Stabilisation of banks<br />

shall be carried out as per requirements of concerned authorities.<br />

7.22 SH, NH & Railways Crossings.<br />

All SH, NH and Railways crossings, the pipeline shall be installed through cased crossings in<br />

consultation with concerned authorities. The area/ boring pit shall be restored to original condition as<br />

per requirement of concerned authorities.<br />

7.23 Pre-<strong>com</strong>missioning and Commissioning assistance<br />

Pipeline Contractor shall be responsible for pre-<strong>com</strong>missioning of the pipeline spread(s) being<br />

installed by him. The above shall include P&ID checks (with respect to requirement of<br />

design/operation/safety and interlocks of latest revision of P&IDs), flushing, tightness test, dewatering,<br />

swabbing, as required as per Document no MH2145-C000-PL-SPC-0013. Contractor shall<br />

make available the power required for functional testing of actuated sectionalizing valves during pre<strong>com</strong>missioning<br />

without any extra cost to the Owner.<br />

7.24 Commissioning<br />

Owner shall carry out overall <strong>com</strong>missioning of the entire pipeline system. However, all<br />

assistance/support including supply of manpower, temporary equipment, tools and tackles, pigs etc.<br />

for <strong>com</strong>missioning shall be provided by Contractors for individual section as per Document no<br />

MH2145-C000-PL-SPC-0013.<br />

n:\513-mh-2145-rkpl\23 exchange\pipeline laying tender-rkpl\final 16.04.2013\pipeline-1\01 sow\mh2145-c000-pl-sow-0001.doc<br />