11.11.2014 Views

Pipelaying Tender-VOL IV - WorleyParsons.com

Pipelaying Tender-VOL IV - WorleyParsons.com

Pipelaying Tender-VOL IV - WorleyParsons.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EPMC SERVICES FOR REWARI – KANPUR PIPELINE<br />

SPECIFICATION FOR PIPELINE HYDRO TESTING<br />

• Non-electric starting system.<br />

• An inlet air shut-down control system to operate on high temperature, over- speed and<br />

gas detection.<br />

• Cooling fan blades should be non-metallic and all fan belts anti-static fire resistant type.<br />

• Any ancillary electrical equipment shall <strong>com</strong>ply with Project Design Specification.<br />

• Hot works permit listing necessary precautions to be taken.<br />

Test instruments shall be in accordance with the requirements of the Table below:<br />

Accuracy of Test Instruments<br />

Instrument<br />

Reading<br />

Division<br />

Range<br />

Accuracy<br />

Dead-weight<br />

Tester<br />

0.01 bar 0 to 1.5 times Test<br />

Pressure<br />

± 0.05<br />

percent<br />

Pressure Gauge 1,2 or 5 bar 0 to 1.5 times Test<br />

Pressure<br />

± 1 percent (Note 1)<br />

Pressure<br />

Recorder<br />

2 or 5 bar<br />

0 to 1.5 times Test<br />

Pressure<br />

± 1 percent (Note 1)<br />

(24 hours)<br />

n:\513-mh-2145-rkpl\11 engineering\11.8 pipelines\06 spec\specification for pipeline hydrotesting\mh2145-c000-<br />

pl-spc-0011.doc<br />

MH2145-C000-PL-SPC-0011 RevA Page 29 of 71

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!