EPMC SERVICES FOR REWARI – KANPUR PIPELINE<br />

SPECIFICATION FOR PIPELINE HYDRO TESTING<br />

working order and correctly installed into the pipeline test section. Venting shall be carried out<br />

repeatedly at points in the test section where air might accumulate, e.g. at installation piping, block<br />

valves etc.<br />

The filling speed shall depend on availability of water and shall not exceed 1.8 m/s. The pressure in<br />

front of the scraper shall be carefully monitored and controlled at not less than 2bar. Depending on<br />

the elevation profile of the test section and the scrapping pressure, it may be necessary to increase<br />

the pressure at the receiver test head in order to control the scraper speed.<br />

During line filling and water treating operations, the following measurements and records shall be<br />

taken:<br />

• Inlet flow rate of line-fill water<br />

• Inlet pressure of line-fill water<br />

• Inlet temperature of line-fill water<br />

• Pressure at the receiver head<br />

• Chemical injection rates In the event of chemical injection pump failure, the filling pump shall<br />

be stopped.<br />

n:\513-mh-2145-rkpl\11 engineering\11.8 pipelines\06 spec\specification for pipeline hydrotesting\mh2145-c000-<br />

pl-spc-0011.doc<br />

MH2145-C000-PL-SPC-0011 RevA Page 36 of 71