EPMC SERVICES FOR REWARI – KANPUR PIPELINE<br />

SCOPE OF WORK–PIPELINE LAYING AND ASSOCIATED WORKS<br />

3.2.1 Part - I (Rewari to SV-06)<br />

Approx. CH.-(Start) 00+000 km to 227+706.89 km on Rewari Kanpur Route<br />

This section covers the laying of approx. 228.555 km long pipeline and associated facilities<br />

located in the states of Haryana, Rajasthan and UP. This includes:<br />

• Laying of 18" NB, 7.1/ 7.9/ 8.7 mm thk, multi-product from approx. CH. -00+00km<br />

(Rewari Dispatch Station) to approximate CH. 227+706.89 km (Supawasa)<br />

• Scrapers launching facilities at Rewari Dispatch Station<br />

• Intermediate pigging station, pig receiving and launching facilities at Bharatpur and<br />

Mathura terminal<br />

• Installation of 6(Six) nos. Sectionalizing valve stations (SV-01 to SV-06) & their facilities<br />

• Laying of Optical Fibre Cable along the pipeline route as per technical specification<br />

including interference mitigation measures<br />

• Design, Engineering, Supply & Installation of TCP & Permanent CP systems<br />

• HDD at River crossing, Canals, water bodies, highways, major road crossing etc as per<br />

technical specification.<br />

3.2.2 Part II (SV-06 to Kanpur)<br />

Approx. CH. – 227+706.89 km to 441+118 km on Rewari Kanpur Route<br />

This section covers the laying of 18”NB, approx. 214.235 km long pipeline and associated<br />

facilities located in the states of Haryana, Rajasthan and UP. This includes:<br />

• Laying of 18" (457 mm) OD, 6.4/7.1/7.9 mm thk, multi product from CH. 227+706.89 km.<br />

near Supawasa (excluding SV-06) to approximate CH. 441+118 km<br />

• Scraper launching and receiving facilities at Saiyyadpur pran Station.<br />

• Installation of 5 (Five) nos. Sectionalizing valve stations (SV-07 to SV-11) & their<br />

facilities<br />

• Scrapers receiving facilities at Kanpur Receipt Station.<br />

• Laying of Optical Fibre Cable along the pipeline route as per technical specification<br />

including interference mitigation measures<br />

• Design, Engineering, Supply & Installation of TCP & Permanent CP systems<br />

• HDD at River crossing, Canals, water bodies, highways, major road crossing etc as per<br />

technical specification.<br />

The battery limits pertaining of work covered in each of the part as described above is<br />

schematically shown in sketch no. MH2145-C000-PL-DSD-0001<br />

n:\513-mh-2145-rkpl\23 exchange\pipeline laying tender-rkpl\final 16.04.2013\pipeline-1\01 sow\mh2145-c000-pl-sow-0001.doc<br />

MH2145-C000-PL-SOW-0001 RevA Page 7 of 42