EPMC SERVICES FOR REWARI – KANPUR PIPELINE<br />

SCOPE OF WORK–PIPELINE LAYING AND ASSOCIATED WORKS<br />

r) Corrosion protection coating (Heat shrink Sleeves) of all field weld joints for buried piping of<br />

all sizes including supply of all materials.<br />

s) Idle time preservation of the pipeline facilities, if required.<br />

For idle time preservation contractor to analyze quality and quantity of corrosion inhibitor<br />

required for the period of preservation to be adopted. The period of preservation to be<br />

adopted shall be as per the instruction of Owner. Contractor to provide relevant test reports of<br />

water sample and detailed calculation to owner for approval.<br />

t) Final clean up and restoration of site, facilities etc. as per the requirement of Owner<br />

representative<br />

u) Transportation of all surplus Owner supplied free issue material to Owner’s designated stores<br />

or as directed by Owner representative after <strong>com</strong>pletion of works.<br />

v) All associated geo-technical, civil, structural, electrical, tele<strong>com</strong>, architectural, mechanical and<br />

general civil works including supply of all material required, unless covered separately<br />

elsewhere in the tender, including construction of foundations for equipment and pipe<br />

supports and sleepers, fabrication & erection of pipe supports/ dummy supports including<br />

support elements such as shoes, clamps, brackets, anchors, guides, insert plates, structural<br />

column etc.<br />

w) Preparation of As-built drawings, documents and project records as per the instruction of<br />

Engineer-in-Charge.<br />

x) In case any activity though not specifically covered in scheduled of rates description but same<br />

is covered under scope of work/ Specification/ specific requirement/ drawings, it is understood<br />

that the contractor shall do such performance & provisions so mentioned without any time<br />

implication.<br />

y) Any other works not specifically listed herein but required for <strong>com</strong>pletion of the works in all<br />

respects.<br />

n:\513-mh-2145-rkpl\23 exchange\pipeline laying tender-rkpl\final 16.04.2013\pipeline-1\01 sow\mh2145-c000-pl-sow-0001.doc<br />

MH2145-C000-PL-SOW-0001 RevA Page 18 of 42