EPMC SERVICES FOR REWARI – KANPUR PIPELINE<br />

SPECIFICATION FOR FIELD JOINT COATING (HEAT SHRINK SLEEVES)<br />

4. APPLICATION PROCEDURE<br />

4.1 GENERAL<br />

The application procedure shall be in accordance with manufacturer’s instructions and the minimum<br />

requirements specified below whichever are the most stringent and shall be demonstrated to and<br />

approved by the Company. Manufacturers expert shall supervise the application and shall be<br />

available at site upon request during qualification of application procedure and during construction at<br />

Contractors cost.<br />

4.2 OPERATOR QUALIFICATION<br />

Operators for coating application shall be given necessary instructions and training before start of<br />

work, by the Contractor. To verify and qualify the application procedures, all coating applied during<br />

the qualification test shall be removed for destructive testing as detailed subsequently in this<br />

specification. Contractor shall only utilize those operators who have been approved/prequalified by<br />

the field joint coating manufacturer.<br />

4.3 SURFACE PREPARATION<br />

Oil, grease and salt shall be removed from steel surface by wiping with rags soaked with suitable<br />

solvents such as naphtha or benzene. Kerosene shall not be used for this purpose. Solvent cleaning<br />

procedure according to SSPC-SP 1 shall be followed.<br />

4.3.1 BLAST CLEANING<br />

Each field joint shall be blast cleaned using a closed cycle blasting unit or open expendable blasting<br />

equipment. With the first equipment type, steel or chilled shot and iron grit shall be used and Garnet<br />

material with the second one (in case the authority having jurisdiction have no objection, the<br />

contractor may adopt sand blasting instead of garnet material). During blast cleaning the pipe surface<br />

temperature shall be simultaneously more than 5°C and more than 3°C above ambient Dew Point,<br />

while the ambient Relative Humidity shall not be greater than 85%. Prior to surface cleaning the<br />

surfaces shall be <strong>com</strong>pletely dry. The surface shall be cleaned to a grade SA 21/2 in accordance with<br />

Swedish Standard SIS-055900 with a roughness profile of 50-70 microns. Surface roughness profile<br />

shall be measured using an approved profile <strong>com</strong>parator in accordance with ISO 8503-1 and shall be<br />

calibrated prior to the start of the work in accordance with ISO 8503-3 or ISO 8503-4. The blast<br />

n:\513-mh-2145-rkpl\11 engineering\11.8 pipelines\06 spec\specification for field joint coating\mh2145-c000-plspc-0015.doc<br />

MH2145-C000-PL-SPC-0015 RevA Page 15 of 42