11.11.2014 Views

Pipelaying Tender-VOL IV - WorleyParsons.com

Pipelaying Tender-VOL IV - WorleyParsons.com

Pipelaying Tender-VOL IV - WorleyParsons.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EPMC SERVICES FOR REWARI – KANPUR PIPELINE<br />

SPECIFICATION FOR PIPELINE HYDRO TESTING<br />

The CONTRACTOR shall <strong>com</strong>pile a <strong>com</strong>prehensive Hydrostatic Test Dossier for each <strong>com</strong>pleted<br />

pipeline. The dossier shall contain a general introduction, all relevant pipeline data recorded during<br />

execution of each individual hydrostatic pressure test.<br />

The Hydrostatic Test Dossier shall contain, as a minimum, the following documents:<br />

• Test Procedure.<br />

• Originals of all recorder charts.<br />

• Records of all pressure readings taken.<br />

• Records of all temperature readings taken.<br />

• Volumes of water added and vented.<br />

• Instrument Test Certification.<br />

• Air content plots and calculations.<br />

• Pressure and temperature plots against time.<br />

• Pressure/temperature correlation calculations.<br />

• Details of line-fill treatment packages.<br />

• Scraper register for cleaning, gauging and filling.<br />

• Photographic record of the used gauging plates.<br />

• Leak locating (if carried out).<br />

• Scraper register for de-watering.<br />

• Details of line-fill water disposal.<br />

• Rectification records (if carried out).<br />

• List of all personnel on testing crews<br />

n:\513-mh-2145-rkpl\11 engineering\11.8 pipelines\06 spec\specification for pipeline hydrotesting\mh2145-c000-<br />

pl-spc-0011.doc<br />

MH2145-C000-PL-SPC-0011 RevA Page 47 of 71

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!