19.01.2015 Views

TPF-C Technology Plan - Exoplanet Exploration Program - NASA

TPF-C Technology Plan - Exoplanet Exploration Program - NASA

TPF-C Technology Plan - Exoplanet Exploration Program - NASA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Integrated Modeling and Model Validation<br />

Figure 5-2. Model technology implementation timeline.<br />

5.6.3 Model Validation<br />

The following schematic depicts the overall M&MV technology development timeline as<br />

defined by the various phases of the Project. For now the actual schedule of the Phase gates has<br />

not been agreed upon, but this information will be included in the next release of the <strong>Technology</strong><br />

<strong>Plan</strong>. In terms of the individual M&MV technology validation dates, those are identical to the<br />

schedules of the testbeds used for validation. The testbed plans and schedules are described in<br />

detail in the previous sections.<br />

5.7 Integrated Modeling Tools<br />

Two concerns that are central to the demonstration of a <strong>TPF</strong> Coronagraph are the<br />

characterization of the telescope system’s point-spread function and its stability at a contrast<br />

ratio of 10 -11 over long periods of time in the presence of numerous system perturbations.<br />

From an analytical perspective, a <strong>TPF</strong> Coronagraph is of particular significance in that it is one<br />

of the first in a series of planned future precision optical missions which, given the impracticality<br />

of system-level, ground-based environmental testing, will necessarily be launched partly on the<br />

91

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!