Chapter 7<br />
7.5.6 Secondary Mirror Tower Partial Structure Testbed<br />
Scope<br />
The current plan is to have this testbed competed, designed and built through Phase A, with<br />
model validation and other technology objectives completed in the early-to-mid-Phase B time<br />
frame. The secondary mirror tower partial structure testbed has achieved TRL 3. The testbed<br />
schedule is given in Table 7-16.<br />
Table 7-16. Secondary Mirror Tower Partial Structure Testbed Schedule<br />
<strong>Plan</strong>ned<br />
Completion<br />
Date<br />
<strong>Plan</strong>ned Activities Performance Targets TRL<br />
Phase A<br />
Design and build testbed<br />
Test materials and subcomponents<br />
individually prior to<br />
testbed integration<br />
Design testbed, hinge/latch and metrology system<br />
consistent with 25 nm SM stability requirement<br />
above 1 Hz<br />
3, 4<br />
Validate sub-component models<br />
Phase B<br />
Perform tests and validate testbed<br />
models<br />
Validate microdynamic bounding analyses on<br />
flight-like hardware for 25 nm SM stability<br />
requirement above 1 Hz<br />
5, 6<br />