Chapter 7<br />

model of <strong>TPF</strong>-C and should include appropriate flexible dynamics of the spacecraft and<br />

instrument module.<br />

The vibration isolation testbed has achieved TRL 3. The testbed schedule is given in Table 7-14.<br />

Table 7-14. Vibration Isolation Testbed Schedule<br />

<strong>Plan</strong>ned<br />

Completion<br />

Date<br />

<strong>Plan</strong>ned Activities Performance Targets TRL<br />

Pre-Phase<br />

A (Q4 &<br />

September<br />

FY05)<br />

Design and analyze three types of<br />

isolation systems: passive, augmented<br />

passive, and active.<br />

Develop models for each isolation design<br />

to support analysis.<br />

Demonstrate via analyses that each<br />

isolation design meets the following<br />

payload pointing and stability<br />

requirements: rigid body pointing,<br />

structure deformation, and optics<br />

deformation.<br />

2, 3<br />

Pre-Phase<br />

A (Q2 &<br />

March<br />

FY06)<br />

Improve isolation designs, add higherfidelity<br />

models to analyses, and<br />

conduct detailed sensitivity analyses.<br />

Complete system-level trade studies<br />

sufficient to assess the relative merits<br />

of isolation point designs.<br />

Identify testbed requirements needed<br />

to mature the technology.<br />

Select isolation design that achieves<br />

dynamics stability requirements based on<br />

analytical results including uncertainty<br />

parameter factors and trade study results.<br />

3<br />

Phase A<br />

Fabricate selected isolation devices<br />

and supporting testbeds for isolation<br />

subsystem test.<br />

Perform isolation subsystem tests.<br />

Update performance predictions based<br />

on isolation test results.<br />

Pointing and stability requirements met<br />

with analyses anchored from isolation<br />

subsystem test.<br />

4, 5<br />

Phase B<br />

Perform integrated pointing and<br />

isolation tests.<br />

Experimentally demonstrate performance<br />

of pointing and isolation system<br />

5, 6<br />