68. Q12 - it is easy to phone and get an unsatisfactory answer. Q3 -<br />
we are not informed of repairs taking place so don’t know what we are<br />
paying for until the bill arrives 18 months later. Q10 The bills are very<br />
confusing and do not explain what we are actually paying for.<br />
69. Garden maintenance is very poor and lacks supervision. the trees<br />
outside the windows of our property have become so large that they<br />
restrict natural light to our living area and it now requires us to have<br />
lighting on during the day. This has been reported on numerous<br />
occasions and nothing has been done.<br />
70. A while ago I had flooding from a flat above mine - took 2 months<br />
to sort out and I had extensive damage to my flat. Last week I had no<br />
water for two days - plumbers came but problem wasn’t quickly solved<br />
- whole stairwell had no water. Seems to be a problem co-ordinating<br />
multiple reports of repairs.<br />
Regenter B3<br />
1. Two and a half years following major damp course work I am still<br />
waiting for guarantees.<br />
2. Under the PFI scheme, the schedule of works I received lacked detail<br />
and was too vague. While the major work has been executed<br />
effectively the cosmetic work has either not been done or has been<br />
done to a low standard.<br />
3. I refer to the so called major works carried out last year under a<br />
section 20 notice. Higgins construction workman made my life hell for<br />
around 4 months doing work that I didn’t ask for, want and in some<br />
cases didn’t need, the quality of workmanship was appalling and I am<br />
to face a bill of many thousands of pounds, still not received yet. on<br />
the cover of this questionnaire it shows two workman up ladders, no<br />
PPE and balancing a gas cylinder on top of a set of steps, health and<br />
Safety my a*se, the main part of my bill, thousands, will be for<br />
scaffolding, because they told me that under H&S they are not allowed<br />
to work off ladders, not the best choice of photograph to use was it?<br />
4. Re: major works - I am still waiting for the final bill after recently<br />
receiving the initial Section 20 notice in February 2008. The S20 notice<br />
was based on an estimated cost for a block at £14,000 although I live<br />
in a one bedroom Victorian conversion. the work carried out was a low<br />
standard. The flat was left in a state. I made frequent calls regarding<br />
work done and in the end gave up as they were not responded to. Re:<br />
service charge: I pay by standing order yet kept receiving notices for<br />
unpaid amounts. I have found Regenter B3 to be stressful to deal with.<br />
5. the service is no value for money. Charged all the time. Service is<br />
86 The <strong>Council</strong>’s obligations to leaseholders