Appendices<br />
other than an estimated one despite having requested several times in<br />
writing. Higgins never finished the renovation works at Nuding Close.<br />
What they did so far is sub standard work.<br />
25. Generally the area is cleared of litter appropriately and graffiti is<br />
cleaned off. However, windows in communal areas are not washed. A<br />
light has remained broken for some time. There does not seem to be a<br />
lot done in grounds maintenance, care taking or repairs. Therefore I<br />
have sought a breakdown of the service provided - hours spent on the<br />
building and works carried out. Although my request has been passed<br />
through the complaints process, I still have not received this<br />
information.<br />
26 The PFI is an absolute disaster. Even the complaints procedure<br />
doesn’t work.<br />
27. We were very frustrated with the delays and length of time the<br />
scaffolding was in place - 10 months instead of 12 weeks as estimated<br />
- on a single house is ridiculous. The system of different agencies and<br />
people to call is confusing.<br />
28. As a leaseholder presented with a major works bill of £10,000 I find<br />
it unacceptable that the time that is allocated to repay this huge sum<br />
of money is so short. Leaseholders do not have ANY choice about<br />
these works being carried out and in reality the work which actually<br />
affects the leaseholder’s flat tends to be minimal. The minimum time to<br />
repay these vast amounts of money should be 3 years.<br />
29. No external maintenance till property left in disrepair. Scaffolding<br />
left outside for over a year before any work carried out (twice)! Major<br />
works survey inadequate and inaccurate. Work poorly managed and<br />
when reported unfinished and poor - no action taken. Now we are<br />
managed by Regenter B3 (Higgins). Survey as above, work as above.<br />
Management of property extremely poor. very unhappy. Workmen just<br />
turn up - no appointments. Rubbish left in front garden. Unacceptable.<br />
Money wasted because of poor management.<br />
90 The <strong>Council</strong>’s obligations to leaseholders