- Page 1 and 2: http://irc.nrc-cnrc.gc.ca Task 2: <
- Page 3 and 4: DISCLAIMER This report presents a r
- Page 5 and 6: 3. Heating, Ventilation, and Energy
- Page 7 and 8: List of Acronyms ach Air changes pe
- Page 9 and 10: Executive Summary Canada’s region
- Page 11 and 12: to 24 in.) in areas below the tree
- Page 13 and 14: 1. Introduction Background Canada
- Page 15 and 16: Moisture Issues: Wood Frame Constru
- Page 17 and 18: of Alaska museum where RH was 45%.
- Page 19: Let Z w is warm side vapour resista
- Page 23 and 24: Canada Mortgage and Housing Corpora
- Page 25 and 26: Upgraded Thermal & Air Tightness Wa
- Page 27 and 28: Single Stud Walls with Interior Str
- Page 29 and 30: Standoff wall system Source: CHBA (
- Page 31 and 32: • polyethylene air/vapour barrier
- Page 33 and 34: Building Envelopes: Northern Canada
- Page 35 and 36: • Climate: The Arctic climate in
- Page 37 and 38: • Plumbing system: To solve conde
- Page 39 and 40: • The SIP house required 264 hour
- Page 41 and 42: • The attached sunspace did not p
- Page 43 and 44: this case, a means of venting the r
- Page 45 and 46: • High energy and transportation
- Page 47 and 48: as well as at high altitudes, where
- Page 49 and 50: Foundation construction in the perm
- Page 51 and 52: oof assemblies, because the roof de
- Page 53 and 54: • The roofing membrane, air/vapou
- Page 55 and 56: • the coasts and islands with the
- Page 57 and 58: Maritime Climate Indigenous Archite
- Page 59 and 60: example, in cold climates, the comf
- Page 61 and 62: Globally, domes constructed with ai
- Page 63 and 64: time limitations existed for the bu
- Page 65 and 66: Pier Foundation System Brooks (2000
- Page 67 and 68: Kwok et al. (1992, 1993) also used
- Page 69 and 70: Composite-Wrapped Concrete Column K
- Page 71 and 72:
consumption and CO 2 emissions asso
- Page 73 and 74:
healthy, sustainable, durable, and
- Page 75 and 76:
Triple-glazed windows (about RSI-0.
- Page 77 and 78:
The building envelope is airtight a
- Page 79 and 80:
Maximum annual heating requirement
- Page 81 and 82:
Energy Performance During the first
- Page 83 and 84:
Roof framing Roof insulation Air ti
- Page 85 and 86:
Table 8 compares R-values and air t
- Page 87 and 88:
in.) diameter, it appears quite whi
- Page 89 and 90:
• an equivalent thermal transmitt
- Page 91 and 92:
3. Heating, Ventilation, and Energy
- Page 93 and 94:
Locations that Work Well For buildi
- Page 95 and 96:
District Heating Considerations Arm
- Page 97 and 98:
• Particulates: the measured leve
- Page 99 and 100:
4. Socio-Economic Issues The Vegeta
- Page 101 and 102:
concentrated in a few integrated sp
- Page 103 and 104:
Snow drifting patterns, winds, temp
- Page 105 and 106:
Thermally Upgraded Wall Systems Thi
- Page 107 and 108:
Coastal Northern Regions For high-m
- Page 109 and 110:
Appendix A: Literature</str
- Page 111 and 112:
References Note: Unless otherwise i
- Page 113 and 114:
———. 1994-1. “Designing Hou
- Page 115 and 116:
Diakun, D. 1997. “Portfolio: Nort
- Page 117 and 118:
Legget, R.F. and C.B. Crawford. 196
- Page 119 and 120:
, then select “Volume 2, 1999-200