Lightweight Concrete for High Strength - Expanded Shale & Clay
Lightweight Concrete for High Strength - Expanded Shale & Clay
Lightweight Concrete for High Strength - Expanded Shale & Clay
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table 6.1 Comparison between experimental and estimated prestress losses of HPLC prestressed<br />
girders<br />
8,000-psi HPLC<br />
Girders<br />
Measured<br />
AASHTO<br />
refined<br />
AASHTO<br />
Lump sum PCI ACI 209<br />
(ksi) (%) (ksi) (%) (ksi) (%) (ksi) (%) (ksi) (%)<br />
Stress After Jacking 202.5 100.0 202.5 100.0 202.5 100.0 202.5 100.0 202.5 100.0<br />
Elastic Shortening 17.0 8.4 11.2 5.5 10.4 5.2 10.5 5.2 12.0 5.9<br />
Creep not measured 16.4 8.1 14.1 7.0 14.8 7.3<br />
Shrinkage separately not estimated<br />
6.5 3.2 5.1 2.5 11.3 5.6<br />
separately<br />
CR+SH 8.8 4.3 22.9 11.3 19.2 9.5 26.1 12.9<br />
Relaxation 11.5* 5.7 18.7 9.2<br />
3.8 1.9 5.6 2.8<br />
Total Timedependent<br />
20.2 10.0 41.5 20.5 24.2 12.0 23.0 11.3 31.7 15.7<br />
Total Losses 37.2 18.4 52.8 26.1 34.7 17.1 33.5 16.5 43.7 21.6<br />
AASHTO AASHTO<br />
10,000-psi HPLC Measured<br />
refined Lump sum PCI ACI 209<br />
Girders<br />
(ksi) (%) (ksi) (%) (ksi) (%) (ksi) (%) (ksi) (%)<br />
Stress After Jacking 202.5 100.0 202.5 100.0 202.5 100.0 202.5 100.0 202.5 100.0<br />
Elastic Shortening 12.0 5.9 10.1 5.0 9.8 4.8 9.0 4.4 10.9 5.4<br />
Creep not measured 16.1 7.9 13.0 6.4 12.7 6.3<br />
Shrinkage separately 6.5 3.2 not estimated 5.1 2.5 11.2 5.6<br />
CR+SH 3.0 1.5 22.6 11.2 separately 18.1 8.9 24.0 11.8<br />
Relaxation 14.6* 7.2 19.2 9.5<br />
3.9 1.9 5.6 2.8<br />
Total Losses 29.6 14.6 51.9 25.6 33.3 16.4 31.0 15.3 40.5 20.0<br />
* Relaxation was determinate with Equation 6.1 using experimental ES, CR and SH.<br />
∆f<br />
2<br />
where<br />
( ∆f<br />
+ ∆f<br />
)<br />
pR2 = 20 − 0.4 ⋅ ∆f<br />
pES<br />
− 0. ⋅<br />
pSR pCR<br />
(6.1)<br />
∆f pR2 : after transfer steel relaxation loss (ksi)<br />
∆f pES : elastic shortening loss (ksi)<br />
∆f pCR : creep of concrete loss (ksi)<br />
∆f pSR : shrinkage of concrete loss (ksi)<br />
Experimental “total losses” <strong>for</strong> 8,000-psi girders made with HPLC was 37.2 ksi. The<br />
AASHTO-LRFD refined and ACI-209 method overestimated total losses by 15.6 and 6.5 ksi,<br />
respectively. The AASHTO-LRFD lump sum and PCI methods were close to experimental data,<br />
but they underestimated total losses by 2.5 and 3.7 ksi, respectively. The experimental prestress<br />
6-2