- Page 1 and 2:
CEIOPS e.V. - Westhafenplatz 1 - 60
- Page 3 and 4:
1. Introduction 1.1. In its letter
- Page 5 and 6:
2.2.2. The following recitals provi
- Page 7 and 8:
“[…]Where, in specific circumst
- Page 9 and 10:
3.6 It is noted that in the recital
- Page 11 and 12:
have in place internal processes an
- Page 13 and 14:
not be appropriate to reduce this v
- Page 15 and 16:
3.36 Hence where an (re)insurance u
- Page 17 and 18:
Scale 3.46 Assigning a scale introd
- Page 19 and 20:
“scale” that will apply in all
- Page 21 and 22:
circumstances of its omission or mi
- Page 23 and 24:
3.81 Under these circumstances, it
- Page 25 and 26:
• the level of certainty i.e. the
- Page 27 and 28:
3.105 All in all, at least the foll
- Page 29 and 30:
the chosen valuation method. If it
- Page 31 and 32:
development, so that it is likely t
- Page 33 and 34:
• As part of supervisory guidance
- Page 35 and 36:
case the threshold is not exceeded.
- Page 37 and 38:
if the threshold is not exceeded th
- Page 39 and 40:
principles. In following paragraphs
- Page 41 and 42:
sign ( x) = −1 if x < 0 . 3.179 E
- Page 43 and 44:
3.193 The time value of the investm
- Page 45 and 46:
distribution to policyholders as th
- Page 47 and 48:
• assume independency between ass
- Page 49 and 50:
company or new line of business, al
- Page 51 and 52:
easonable be supposed proportional
- Page 53 and 54:
incurred when the method is applied
- Page 55 and 56:
3.261 The general rule for calculat
- Page 57 and 58:
• the loss absorbing capacity of
- Page 59 and 60: 3.285 As a consequence of this, the
- Page 61 and 62: SCR for the individual lines of bus
- Page 63 and 64: • the loss absorbing capacity of
- Page 65 and 66: OPRU,lob,>0 = an approximation of t
- Page 67 and 68: Life insurance 3.323 With respect t
- Page 69 and 70: 3.330 With respect to health insura
- Page 71 and 72: eing applicable for life insurance
- Page 73 and 74: 3.351 The structure of the health u
- Page 75 and 76: ∆rn = the absolute decrease of th
- Page 77 and 78: the methods to be used for projecti
- Page 79 and 80: CEIOPS’s draft advice on the valu
- Page 81 and 82: 3.392 In this context, the technica
- Page 83 and 84: clearly the present difficulties of
- Page 85 and 86: • Even if the undertaking’s rei
- Page 87 and 88: information regarding the RBNS-clai
- Page 89 and 90: CEIOPS’ Advice Simplifications re
- Page 91 and 92: 3.5. Quarterly calculations 3.444 A
- Page 93 and 94: e to use the simplified calculation
- Page 95 and 96: Annex A. Example to illustrate the
- Page 97 and 98: Annex B. Some technical aspects reg
- Page 99 and 100: is accurate because the payment of
- Page 101 and 102: C.6. The individual elements sketch
- Page 103 and 104: UMRU,lob,≥0 = max{∑ ≤ t Durmo
- Page 105 and 106: E.5. The considered proxies based o
- Page 107 and 108: E.14. The following criteria should
- Page 109: “The gross-to-net proxy was used