14.08.2012 Views

CEIOPS' Advice for Level 2 Implementing ... - EIOPA - Europa

CEIOPS' Advice for Level 2 Implementing ... - EIOPA - Europa

CEIOPS' Advice for Level 2 Implementing ... - EIOPA - Europa

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

furthermore<br />

N_2005 = 100 (85 reported in 2006 and 10 reported in 2007)<br />

R_2008 = 10.500 ; R_2007 = 8.500<br />

R_2006 = 8.200 ; R_2005 = 8.700<br />

The overall cost of claims reported in 2008 amounts 11.000.000 €, from which<br />

5.500.000 € are case reserves ( with an estimated bias = 0.9 ).<br />

The estimated inflation <strong>for</strong> 2009, 2010 and 2011 is 5 per cent (every year). The<br />

discounting rate is 4 per cent <strong>for</strong> the same years.<br />

The claims reported every year are paid in a 50% the year of reporting, the year<br />

after is paid the 35%, and the third year is paid the 15% (this is an estimation<br />

based on entity experience or market experience).<br />

Solution<br />

Bias correction = 6.111.111<br />

11.611.111<br />

50% = 5.805.556 6.095.833 5.861.378<br />

35% = 4.063.889 4.480.438 4.142.416<br />

15% = 1.741.667 2.016.197 1.792.392<br />

After bias correction and inflation+discounting= 11.796.186<br />

Overall cost of claims reported in 2008 = 11.796.186<br />

96/112<br />

C2008 = 1.123<br />

p1= 0,85<br />

p2= 0,95<br />

N2007/p1= 106 N2006/p2= 105<br />

N2008= 129<br />

IBNR reserve = 144.501,20 €<br />

If the average cost of IBNR claims is different to the average cost of reported<br />

claims, Ct can be adjusted.<br />

This method needs at least four years of experience. Thius, in case of new<br />

undertakings or a new line of business this simplification does not apply.<br />

© CEIOPS 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!