CEIOPS' Advice for Level 2 Implementing ... - EIOPA - Europa
CEIOPS' Advice for Level 2 Implementing ... - EIOPA - Europa
CEIOPS' Advice for Level 2 Implementing ... - EIOPA - Europa
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
the methods to be used <strong>for</strong> projecting future SCRs per line of business:<br />
(1) make a full calculation of all future SCRs 86 without using<br />
simplifications;<br />
(2) approximate the individual risks or sub-risks within some or all<br />
modules and sub-modules to be used <strong>for</strong> the calculation of future<br />
SCRs;<br />
(3) approximate the whole SCR <strong>for</strong> each future year, e.g. by using a<br />
proportional approach; and<br />
(4) estimate all future SCRs “at once”, e.g. by using an approximation<br />
based on the duration approach.<br />
(5) approximate the risk margin by calculating it as a percentage of<br />
the best estimate.<br />
86 Note that, where all future SCRs have been projected, it should be straight<strong>for</strong>ward to calculate the risk<br />
margin according to the general <strong>for</strong>mula set out in CEIOPS’ Consultation Paper CP 42 on the calculation of the<br />
risk margin in technical provisions.<br />
77/112<br />
© CEIOPS 2010