11.07.2015 Views

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Annual Environmental Management Report <strong>2010</strong> - <strong>2011</strong><strong>Wambo</strong> <strong>Coal</strong> Pty Limited<strong>2010</strong>-<strong>2011</strong> <strong>AEMR</strong>MonthpHCriteria 6.0-9.5P13 P15 P16EC(uS/cm)1,000-3,200Depth toWater (m)pH5.96-7.98 6.0-9.5EC(uS/cm)2,900-22,000Depth toWater (m)pH5.46-6.42 6.0-9.5EC(uS/cm)3,800-22,700Depth toWater (m)6.47-7.37Jul-10Aug-10 7.63 837 7.34 7.65 7,960 6.22 6.99 8,930 7.54Sep-10Oct-10 6.38 987 7.37 7.37 8,530 6.23 7.36 8780 7.48Nov-10Dec-10 6.56 987 7.37 7.37 8,330 6.05 7.35 8,350 7.34Jan-11Feb-11 7.50 966 7.33 7.70 8,130 6.38 7.55 8,120 7.66Mar-11Apr-11May-11Jun-11 6.15 1,027 6.53 7.50 6,800 5.99 7.29 6,700 7.18Average 6.84 961 7.19 7.52 7,950 6.17 7.31 8,176 7.44Appendix 2D: Groundwater Monitoring Results

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!