11.07.2015 Views

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Wambo</strong> <strong>Coal</strong> Pty Limited<strong>2010</strong>-<strong>2011</strong> <strong>AEMR</strong>NODATE &TIMERECEIVEDAREARESPONSIBLE7 22/12/<strong>2010</strong> Downer EDI /workshop8 29/12/<strong>2010</strong> Downer EDI / OpenCut9 4/01/<strong>2011</strong> Downer EDI / OpenCut10 12/01/<strong>2011</strong> Downer EDI / OpenCutCAT.ISSUEcam locks.1 200L of oil released to ground (withinconcrete sealed area) during loading ofservice truck. Compartment lid not sealedproperly and cut off valve failed.1 Loaded haul truck 173 travelling to the140 Dump when RHR Final Drive failedspilling approx 80lts of oil onto haul road1 930e haul truck parked at 130 Park Uphad been fuelled up, breathers on tankfailed to shut off allowing fuel to overflow.Approx 50 lts was spilled onto ground andcontained3 Blast event of 12/01/<strong>2011</strong> Montrose Pit.Large Blast Fume. Community Complaintx 2 (Jerry’s Plains). GOS Drill Rig –Drillers in line of Blast Plume – Inhaledsmall quantity – had to immediatelyevacuate areaACTION TAKENoperators to be approved by DBS.Material recovered and impacted area cleaned.Recovered material transferred to oil separator. Fuelshutoff valve to be repaired. Ensure operators inspectcompartment secure before pumping. Routinemaintenance to ensure continued operation of cut offvalve.Production 4 notified, oil contained with dirt bund,Grader called and graded dirt bund – loader shoveledcontaminated soil. Contaminated soil placed at RL 100Dump. Service & inspections maintained, nocontributing factors other than mechanical failure.Fuel contained in V-Drain and disposed. Audit on all930e’s Breather SystemsMontrose Overburden Shot resulted in a large blastplume of dense orange smoke which proceeded totravel North, North West.Sentry’s were located on the Northern end of theNWC Diversion wall radioed that they were pullingback to avoid smoke plumeDrill rig was located in the path of the smoke plume.Upon investigation, two GOS drillers reported to thatthey received a small dose of fumes and could smellthe odour and immediately evacuated to a safedistance. The drill rig was located outside theexclusion zone. However the Drill rig was within siteof Sentry.Complaint received at approximately 3.45pm viathe <strong>Wambo</strong> Community Enquiries Line a communitycomplaint from a Jerry’s Plains resident in relation tothe Blast EventUpon investigation, the <strong>Wambo</strong> <strong>Coal</strong> CommunityBlast Information line had not been updated.Appendix 3: Summary of Environmental Incidents

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!