11.07.2015 Views

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

aemc<strong>Wambo</strong> <strong>Coal</strong> Mine, Rail Loop and <strong>Coal</strong> LoaderIndependent Environmental Audit – Minister’s Condition of Approvalwarranted, the Applicant shall:(a) consult with the landowner to determine his/her concerns; and(b) commission a suitably qualified person – whose appointmenthas been approved by the Director-General – to conduct airquality and/or noise monitoring at the relevant dwelling todetermine whether the development is complying with therelevant impact assessment criteria, and identify the source(s)and scale of any air quality and/or noise impact at thedwelling, and the development‟s contribution to this impact.Within 14 days of receiving the results of this independent review,the Applicant shall give a copy of these results to the Director-General and landowner.5/5 If the independent review (referred to in condition 4) determines thatthe development is complying with the relevant impact assessmentcriteria listed in schedule 4 at the dwelling, then the Applicant maydiscontinue the independent review with the approval of theDirector-General.5/6 If the independent review (referred to in condition 4) determines thatthe development is not complying with the relevant impactassessment criteria listed in schedule 4 at the dwelling, and that thedevelopment is primarily responsible for this non-compliance, theApplicant shall:(a)(b)take all practicable measures, in consultation with thelandowner, to ensure that the development complies with therelevant impact assessment criteria; and conduct further airquality and/or noise monitoring at the dwelling to determinewhether these measures ensure compliance; orsecure a written agreement with the landowner to allowexceedances of the air quality and/or noise impactassessment criteria listed in schedule 4.If the additional monitoring referred to above subsequentlydetermines that the development is complying with the relevantimpact assessment criteria listed in schedule 4 at the dwelling, thenthe Applicant may discontinue the independent review with theapproval of the Director-General.If the measures referred to in (a) do not ensure compliance with theair quality and/or noise land acquisition criteria listed in schedule 4at the dwelling, and the Applicant cannot secure a writtenagreement with the landowner to allow exceedances of the airquality and/or noise impact assessment criteria listed in schedule 4,then the Applicant shall, upon receiving a written request from thelandowner, acquire all or part of the landowner‟s land in accordancewith the procedures in conditions 9-11 belowYesOngoingNotedNot activatedSee MCoA 5/4.See MCoA 5/4.of the noise levels received at the property. The reportconcluded good correlation between the measurednoise levels and model results for noise received fromthe <strong>Wambo</strong> <strong>Coal</strong> operations at the Fenwick residence.trevor brown & associates 82applied environmental management consultants

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!