11.07.2015 Views

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

aemc<strong>Wambo</strong> <strong>Coal</strong> Mine, Rail Loop and <strong>Coal</strong> LoaderIndependent Environmental Audit – Minister’s Condition of Approval Letter from DII re Approval ofSite Water ManagementPlan, April <strong>2010</strong> Letter from DoP Approvingan Extension of the date ofSubmission of the Site WaterManagement Plan, 4 Nov<strong>2010</strong>(g)Yescontained as Appendix to the SGWRP(g) Strategy for decommissioning water managementstructures contained in SWMP Section 6.6No approval correspondence acknowledging the <strong>2010</strong> revisedSWMPs has been received from DoP (DP&I).4/31 The North <strong>Wambo</strong> Creek Diversion Plan shall include:(a) the detailed design and specifications of the creek diversion,including the flow control bund, cut off wall, and channel;(b) a revegetation program for the channel using a range ofsuitable native riparian and floodplain species;(c) the detailed design of the system that would return interceptedground water to the alluvial aquifer downstream of the opencut;(d) a construction program for the creek diversion, describing howthe work would be staged, and progressively integrated withthe mining operations and the mine waste emplacementdrainage system;(e) water quality, ecological and geomorphic performance criteriafor the creek diversion;(f) a program to monitor water quality, ecological, andgeomorphic integrity of the creek diversion; and(g) a program to inspect and maintain the creek diversion andrevegetation works during the developmentNote: The Applicant may prepare and submit the North <strong>Wambo</strong>Diversion Plan on a progressive basis to reflect the relevantstages of the proposed diversion.North <strong>Wambo</strong> Creek DiversionPlan, Sep 2007Letter from DPI re Approval ofthe North <strong>Wambo</strong> CreekDiversion Plan, DWE, 15 Nov2007Letter from DPI re Approval ofthe North <strong>Wambo</strong> CreekDiversion Plan, 31 March 2008Letter from DoP re Approval ofthe North <strong>Wambo</strong> CreekDiversion Plan, 14 Apr 2008Draft Revised North <strong>Wambo</strong>Creek Diversion Plan, April<strong>2010</strong>North <strong>Wambo</strong> CreekSubsidence ResponseStrategy 2008(a)Yes(b)Yes(c )NO(see Rec 3)(d)Yes(e)Yes(f)Yes(g)YesThe North <strong>Wambo</strong> Creek Diversion Plan was prepared andsubmitted to the DPI, and DWE for comment and consultation in2007-2008. The North <strong>Wambo</strong> Creek Diversion Plan wassubmitted to DoP on the 28 April <strong>2010</strong> following comments fromDPI and DWE on the draft Plan.(a) Appendix A NWCD Design Report(b) Appendix B Tables 1, 2 and 3 NWCD RehabilitationPlan(c) detailed design of the system that would returnintercepted ground water to the alluvial aquiferdownstream of the open cut is not included in the Plan(d) Appendix C NWCD Construction Program providescommentary on the activity and tasks to be undertakenduring construction, describing how the diversionchannel works would be staged, and progressivelyintegrated with the mining operations. Site inspectionconfirmed that the first two stages of creek diversionhave been undertaken, third stage yet to beconstructed.(e) Water quality performance criteria considered in<strong>Wambo</strong>‟s SWMP and overall Environmental MonitoringProgram. Section 3.5 of Appendix B of the NWCDP(Rehabilitation Plan) provides ecological performancecriteria for the creek diversion. Section 7 of Appendix Aof the NWCDP (Design Report) provides geomorphicperformance criteria for the creek diversion.(f) Appendix D Surface Water Monitoring Program(g) Appendix A section 7 Inspections, Appendix B section3.5 and 3.7 Inspections, and Appendix C section 4Maintenance4/32 Erosion and Sediment Control Plan shall:(a) be consistent with the requirements of the Department ofHousing‟s Managing Urban Stormwater: Soils and Erosion and SedimentControl Plan, Mar 2006 Mining Operations Plan JulThe Erosion and Sediment Control Plan was approved as part ofthe Site Water Management Plan on 30 June 2006.The latest revision of the Erosion and Sediment Control Plan wastrevor brown & associates 61applied environmental management consultants

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!