11.07.2015 Views

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The survey purpose is to quantify and describe the existing acoustic environment aroundWCM and WCRS and compare results with relevant development consent conditions ormodelled EIS noise levels.1.2 Monitoring Locations and FrequencyTable 1.1 outlines the monitor type and frequency for the noise monitoring locations shownin Figure 1.Table 1.1 WAMBO COAL MONITORING LOCATIONS AND FREQUENCY1SiteReferenceSite LocationMonitorTypeConsent RequirementFrequency2N01 Lambkin Residence AttendedMine & Rail SpurDevelopment ConsentsQuarterlyN03Kelly ResidenceReal-time &AttendedMine Development ConsentContinuous & QuarterlyN16Muller ResidenceReal-time &AttendedMine Development ConsentContinuous & QuarterlyN20 Thelander Residence Real-time Mine Development Consent ContinuousN21<strong>Wambo</strong> SouthResidenceReal-time Mine Development Consent ContinuousN224 Henderson Residence AttendedRail Spur DevelopmentConsentQuarterlyN23 Redmanvale Road Attended Mine Development Consent QuarterlyN24 Curlewis Residence AttendedN25 Dyson Residence Rail Pass-byMine & Rail SpurDevelopment ConsentsRail Spur DevelopmentConsentQuarterlyEvery fifth quarterlyperiodNotes: 1. Sourced from <strong>Wambo</strong> <strong>Coal</strong> Noise Monitoring Program – EMP011 2007;2. Quarterly attended locations are shown in italics;3. Dyson required every fifth quarterly period (last monitored in Q2 <strong>2011</strong>); and4. Monitoring at N22 was not undertaken after Quarter 3, <strong>2010</strong> due to a change of ownership.11263_R01.docPage 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!