11.07.2015 Views

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

aemc<strong>Wambo</strong> <strong>Coal</strong> Mine, Rail Loop and <strong>Coal</strong> LoaderIndependent Environmental Audit – Minister’s Condition of Approvalpremises.The report must be addressed to The Manager, Hunter Region andbe received by no later than 25 February <strong>2011</strong>.Special conditionsE1 Hunter River Salinity Trading SchemeE1.1 This licence authorises the discharge of saline water into theHunter River Catchment from an authorised discharge point (orpoints), in accordance with the Protection of the EnvironmentOperations (Hunter River Salinity Trading Scheme) Regulation2002.Noteddominant.E1.2 For the purposes of Clauses 23 and 29 of the Protection of theEnvironment Operations (Hunter River Salinity Trading Scheme)Regulation 2002 the licensee must apply the conversion factor of0.6.E1.3 Under this licence the licensee may only discharge saline waterinto Wollombi Brook when the flow in the brook exceeds 500 ML/day, measured at the Bulga gauging station.NotedYesHRSTS approved discharge point 4Discharges have only occurred when the flow in WollombiBrook exceeded 500ML/day as measured at the gaugingstation.trevor brown & associates 122applied environmental management consultants

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!