11.07.2015 Views

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

aemc<strong>Wambo</strong> <strong>Coal</strong> Mine, Rail Loop and <strong>Coal</strong> LoaderIndependent Environmental Audit – Minister’s Condition of ApprovalDevelopment Application: DA 177-8-2004 - The development of rail and coal loading infrastructure adjacent to the <strong>Wambo</strong> <strong>Coal</strong> MineBlue type represents Notice of Modification 15 December 2006 (126-10-2006)MCoA Development Application: DA 177-8-2004 Audit Evidence Compliance CommentsSCHEDULE 3 ADMINISTRATIVE CONDITIONSObligation to Minimise Harm to the Environment1 The Applicant shall implement all practicable measures to preventand/or minimise any harm to the environment that may result from theconstruction, operation, or rehabilitation of the development.Terms of Approval2 The Applicant shall carry out the development generally in accordancewith the:(a) DA 177-8-2004;(b) SEE titled Proposed Alterations to the <strong>Wambo</strong> DevelopmentProject – Rail and Train Loading Infrastructure, dated June 2004,and prepared by Resource Strategies Pty Ltd;(c) letter to Minister, dated 13 August 2004, from <strong>Wambo</strong> <strong>Coal</strong> Pty Ltd;(d) traffic Study titled Report for Upgrade of Wallaby ScrubRoad/Golden Highway Intersection dated May 2006, and preparedby GHD Pty Ltd; and(e) conditions of this consent.3 If there is any inconsistency between the above documents, the latterdocument shall prevail over the former to the extent of theinconsistency. However, the conditions of this consent shall prevailover all other documents to the extent of any inconsistency.4 The Applicant shall comply with any reasonable requirement/s of theDirector-General arising from the Department‟s assessment of:(a) any reports, plans or correspondence that are submitted inaccordance with this consent; and(b) the implementation of any actions or measures contained in thesereports, plans or correspondence.Limits on Approval SEE - Rail and TrainLoading Infrastructure,Resource Strategies datedJun 2004 Report for Upgrade ofWallaby ScrubRoad/Golden HighwayIntersection, GHD, May2006,NotedYesNotedNotedThe <strong>Wambo</strong> Rail Development was constructed generally inaccordance with DA177-8-2004 and the Statement ofEnvironmental Effects - Rail and Train Loading Infrastructure,2004.No additional requirements from the Director-General werereceived.5 This consent lapses 21 years after the date it commences. Noted This consent will lapse on 15 Dec 2027.6 The Applicant shall not transport more than 15 million tonnes ofproduct coal via this development each year. <strong>AEMR</strong> 2006-2007 <strong>AEMR</strong> 2007-2008Yes Product railed from the <strong>Wambo</strong> Rail loop each year has beenless than 15 mtpa: <strong>AEMR</strong> 2008-2009 <strong>AEMR</strong> 2009-<strong>2010</strong>YearTonnage/YearJun <strong>2010</strong>-May <strong>2011</strong> 5,090,166Jul 2009-Jun <strong>2010</strong> 6,402,290 (includes 1,502,936from United).Jul 2008-Jun 2009 6,259,738 (includes 1,911,530from United).trevor brown & associates 95applied environmental management consultants

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!