11.07.2015 Views

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Wambo</strong> <strong>Coal</strong> Pty Limited<strong>2010</strong>-<strong>2011</strong> <strong>AEMR</strong>NODATE &TIMERECEIVEDAREARESPONSIBLECAT.ISSUEACTION TAKEN17 16/6/<strong>2011</strong> Environment &Community2 During a licenced discharge under theManaged Envelope of Residual Flood(MERF), discharge water exceeded EPLdischarge limits for Total SuspendedSolids (TSS).Following incident investigation, a turbidity meter waspurchased to provide realtime guidance on TSS levels,before approving discharge. Sampling protocol forHRSTS/MERF discharges modified to reflectrequirement for Tss/turbidity sampling capacity.Appendix 3: Summary of Environmental Incidents

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!