11.07.2015 Views

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

aemc<strong>Wambo</strong> <strong>Coal</strong> Mine, Rail Loop and <strong>Coal</strong> LoaderIndependent Environmental Audit – Minister’s Condition of Approval3 Limit conditionsL1 Pollution of watersL1.1 Except as may be expressly provided in any other condition of thislicence, the licensee must comply with section 120 of theProtection of the Environment Operations Act 1997.L2 Load limits - Not applicableL3 Concentration limitsL3.1 For each monitoring/discharge point or utilisation area specified inthe table\s below (by a point number), the concentration of apollutant discharged at that point, or applied to that area, must notexceed concentration limits specified for that pollutant in the table.L3.2 Where a pH quality limit is specified in the table, the specifiedpercentage of samples must be within the specified ranges.L3.3 To avoid any doubt, this condition does not authorise the pollutionof waters by any pollutant other than those specified in the table\s.Water and LandPOINT 4Pollutant Unit of Measure 100 percentileConc. LimitpH pH units 6.5 – 9.5Total suspended solids milligrams per litre 120L4 Volume and mass limitsL4.1 For each discharge point or utilisation area specified below (by apoint number), the volume/mass of:(a) liquids discharged to water; or;(b) solids or liquids applied to the area, must not exceed thevolume/mass limit specified for that discharge point or area.Point Unit of measure Volume/Mass Limit4 megalitres per day 250L5 Waste - Not applicableL6 Noise LimitsL6.1 Noise generated at the premises must not exceed the noise limitspresented in the table. The noise limits in the table represent thenoise contribution from the premises:L6.2 For the purposes of condition L6.1 Day is defined as the period from 7am to 6pm Monday toSaturday and 8am to 6pm Sundays and Public Holidays Evening is defined as the period 6pm to 10pmNight is defined as the period from 10pm to 7am Mondayto Saturday and 10pm to 8am Sundays and PublicHolidays. Protection of the EnvironmentOperations Act 1997, clause 120 Site Water Monitoring Program,Jan <strong>2010</strong> Groundwater MonitoringProgram, Feb <strong>2010</strong> Site Water Monitoring Program,Jan <strong>2010</strong> Groundwater MonitoringProgram, Feb <strong>2010</strong> Site Water Monitoring Program,Jan <strong>2010</strong>NotedYesNotedNotedNotedNotedNotedThe <strong>Wambo</strong> Site Water Monitoring Program and GroundwaterMonitoring Program include monitoring for specifiedparameters, in accordance with the requirements of thiscondition.The <strong>Wambo</strong> Site Water Monitoring Program and GroundwaterMonitoring Program include monitoring for specifiedparameters, in accordance with the requirements of thiscondition.Refer to MCoA Schedule 4 condition 9 (DA 305-7-2003-i).trevor brown & associates 110applied environmental management consultants

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!