11.07.2015 Views

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

aemc<strong>Wambo</strong> <strong>Coal</strong> Mine, Rail Loop and <strong>Coal</strong> LoaderIndependent Environmental Audit – Minister’s Condition of Approval5Working RequirementThe lease holder must:(a) ensure that at least 11 competent people are efficiently employedon the lease area on each week day except Sunday or any week daythat is public a holiday; OR(b) expend on operations carried out in the course of prospecting ormining the lease area, an amount of not less than $192,500 perannum whilst the lease is in force.NotedThere were approximately 700 personnel, includingcontractors, employed at WCPL during <strong>2010</strong>-<strong>2011</strong>.Open Cut mining, employed a total of 333 personnel at 30June <strong>2010</strong>, underground mining 276 personnel, CHPP 60personnel and administration 68 staff..The Minister may at any time or times, by instrument in writing servedon the lease holder, increase or decrease the expenditure required orthe number of people to be employed.Noted67Control of 0perations(a) lf an Environmental Officer of the Department believes that thelease holder is not complying with any provision of the Act or anycondition of this lease relating to the working of the lease, he maydirect the lease holder to:(i) cease working the lease; or(ii) cease that part of the operation not complying with the Act orconditions;until in the opinion of the Environmental Officer the situation isrectified.(b) The lease holder must comply with any direction given. TheDirector-General may confirm, vary or revoke any such direction.(c) A direction referred to in this condition may be served on the MineManager.ReportsThe lease holder must provide an exploration report, within a period oftwenty- eight days after each anniversary of the date this lease haseffect or at such other date as the Director-General may stipulate, ofeach year. The report must be to the satisfaction of the Director-General and contain the following:(a) Full particulars, including results, interpretation and conclusions, ofall exploration conducted during the twelve months period;(b) Details of expenditure incurred in conducting that exploration;(c) A summary of all geological findings acquired through mining ordevelopment evaluation activities;(d) Particulars of exploration proposed to be conducted in the nexttwelve months period;(e) All plans, maps, sections and other data necessary to satisfactorilyinterpret the report.NotedNotedYesWCPL provides annual reports to the D-G in relation toexploration conducted during each 12 month period.trevor brown & associates 127applied environmental management consultants

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!