11.07.2015 Views

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

aemc<strong>Wambo</strong> <strong>Coal</strong> Mine, Rail Loop and <strong>Coal</strong> LoaderIndependent Environmental Audit – Minister’s Condition of ApprovalPollutantDepositeddustAveragingperiodMaximumincrease indepositeddust levelMax. total dep.dust levelAnnual 2 g/m 2 /mth 4 g/m 2 /mthTable 4: Long term impact assessment criteria for deposited dustLand Acquisition Criteria4/3 If the air pollution generated by the development exceeds thecriteria in Tables 5, 6, and 7 at any privately-owned land, theApplicant shall, upon receiving a written request for acquisition fromthe landowner, acquire the land in accordance with the proceduresin conditions 9-11 of schedule 5.Pollutant Averaging period CriterionYesdust level” (with a limit of 2g/m 2 /month) is exceeded and theassessment results should be reported in the next Annual report.No written requests from landowners of privately owned landhave been received.Total suspendedparticulate (TSP) matterParticulate matter< 10 µm (PM 10)Annual 90 µg/m 3Annual 30 µg/m 3Table 5: Long term land acquisition criteria for particulate matterPollutantAveragingperiodCriterion%ileBasisParticulatematter< 10 µm(PM 10)24 hour150µg/m 3 99 2 Total 3Particulatematter < 10µm (PM 10)24 hour 50 µg/m 3 98.6 Increment 4Table 6: Short term land acquisition criteria for particulate matterPollutantAveragingperiodMaximumincrease indepositeddust levelMaximum totaldeposited dustleveltrevor brown & associates 43applied environmental management consultants

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!