11.07.2015 Views

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.4 RecommendationsImplementation of the following recommendations would improve the condition scores ofNorth <strong>Wambo</strong> Creek, South <strong>Wambo</strong> Creek and Stoney Creek:• Where appropriate, undertake remediation works at sites of significant bank erosion;• Where remediation works are likely to cause more damage than good, plantseedlings of local tree species around erosion areas to stabilise banks and assist inthe prevention of future erosion;• Prevent or limit livestock access to North <strong>Wambo</strong> Creek and Stoney Creek;• Undertaken rabbit control measures along all three creeks;• Undertake a weed management program that uses successional techniques that donot leave areas of bare soil;4.5 ConclusionRiparian monitoring identified Stoney Creek as being in good condition, and North <strong>Wambo</strong>and South <strong>Wambo</strong> Creeks in moderate condition. Current bank erosion problem areas area result of historic land management practises however in the absence of currentmanagement will continue to degrade. Recommendations have been made to addressproblem erosion areas and to undertake other management actions that would lead toincreased condition scores for all three creeks.<strong>2010</strong> Annual Ecological Monitoring Report, Draft Report, January <strong>2011</strong> Page 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!