11.07.2015 Views

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>2010</strong>-<strong>2011</strong> <strong>AEMR</strong>No DoPI Issue DoPI Action Description Summary Due Comments4 North <strong>Wambo</strong> Creek Diversion Stage 1 of the diversion has beencompleted. Please submit a stagingtimetable for the remainder of the diversionwork to the DoPI4/03/<strong>2011</strong> For a summary of the staging timetable to complete the NWCD,please refer to Section 5.1.4.5 Rehabilitation It was noted that the target from the <strong>AEMR</strong>2009-10 for rehabilitation was achieved;however the rehabilitation target for the<strong>2010</strong>-10 <strong>AEMR</strong> period is unlikely to beachieved. DoPI will be reviewing WCPL’srehabilitation performance closely.Ongoing As discussed in Section 5.1.2, Open Cut rehabilitation has notmet targets for the reporting period.6 Blast data - Homestead Complex There were four high overpressure resultsat the Homestead Complex monitorreported in the 2009-10 <strong>AEMR</strong>. WCPL toprovide to the DoPI a structural assessmentreport in accordance with Condition 64 ofDA305-7-2003.11/03/<strong>2011</strong> These blast vibration results were forwarded to an engineer forassessment. The engineer stated that, based only on groundvibration, he was unable to confidently determine whetherblasts were impacting on the homestead. This triggered theblast vibration study that is currently ongoing (see Section3.13.2).7 Website Content Ensure that a copy of the CCC Minutes isposted on the company’s website within 28days of each meeting. In accordance withthe conditions of consent, all statutoryapprovals, strategies, plans, programs to bemade available on the company’s website.Ongoing CCC minutes posted. Publishing of other documents ongoing.8 Management Plans The Singleton Office does hold copies of theapproved management plans, programs,and strategies. Please submit copies for theDoPI records.Completed In a letter dated 17 March <strong>2011</strong>, WCPL provided copies ofmanagement plans, programs, and strategies to DoPI Singletonoffice.9 Community Enquiries Line Review the company’s out-of-hourstelephone service.Completed Please refer to DTIRIS comment (1) above10 Outstanding actions from 2008-09 Action items 2 and 3 in the <strong>AEMR</strong> 2008-09relating to the rehabilitation of the NorthEast Tailings Dam are outstanding.Ongoing Please refer to DTIRIS comments (3) & (4) abovePage 17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!