11.07.2015 Views

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Wambo</strong> <strong>Coal</strong> Pty Limited<strong>2010</strong>-<strong>2011</strong> <strong>AEMR</strong>Summary of Environmental Incidents1 July <strong>2010</strong> - 30 June <strong>2011</strong>NODATE &TIMERECEIVEDAREARESPONSIBLE1 15/07/<strong>2010</strong> Downer EDI / OpenCut2 23/09/<strong>2010</strong> Downer EDI / OpenCut3 27/9/<strong>2010</strong> Downer EDI / OpenCut4 29/09/<strong>2010</strong> Downer EDI / OpenCut5 30/9/<strong>2010</strong> Downer EDI / OpenCut6 13/12/<strong>2010</strong> Downer EDI /workshopCAT.ISSUE1 22234 blew hydraulic hose in Bates Pit19, approx 700l of hydraulic fluid lost toground.1 Hydraulic hose failure on digger EX2500(22085). Slow leak - approx 600l ofhydraulic fluid lost to ground. Operator notaware of failure until low oil level alarmdisplayed.1 Bates South Pit – EX2500 digger workingin tight area made contact with losematerial which subsequently broke awayfalling and breaking fitting on hydraulic oiltanker.1 Service truck fuelling water cart 21182,fuel tank overflowed spilling approx 300ltsof diesel onto ground – Fuel cap missingfrom tank – Not identified prior to fuelling1 Spillage of approx 200L of AmmoniumNitrate Emulsion (ANE)1 40L of ANFO emulsion released toground at reloading facility during reload.Pumping started before seals fitted toACTION TAKENArea of contamination was bunded and excavated anddeposited at RL100. Continue ongoing maintenanceand pre-shift checks to ensure integrity of hose(s) andfittings.Digger was shutdown, stopping release andcontamination was contained to localised area. Area ofcontamination was excavated and hauled to RL130dump. Operation of digger in soft conditions causingdamage to track tension return hose in swivel area,identified as contributing factor in hose failure. Continuewith scheduled ongoing maintenance and inspections.Operator was notified by personnel of oil leak,immediately shut machine down, reported andsubsequent containment and clean-up actions / disposalwas undertaken. Operator(s) to consider workingenvironments, particularly tight environments andenvironments where changes throughout the course ofwork occur.Contaminated soil removed from area and disposed offinto Rug Dump. Continue ongoing maintenance andpre-shift checks to ensure integrity of hose(s) andfittingsWhilst transferring ANE from Crawford’s Road Tankerinto storage tanks at DBS Blast Services compound.The carn lock fitting on the transfers hose from thepump to the tank blew off causing a spill of 200L of ANEContaminated soil was collected at disposed off at RugDump – Fit metal locking seals to all cam lock fittings onhoses transferring ANE.Emulsion recovered and placed on shot. Pump isolateduntil seals are fitted to cam-locks. Transport operators tobe retrained on transfer of emulsion. TransportAppendix 3: Summary of Environmental Incidents

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!