11.07.2015 Views

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>2010</strong>-<strong>2011</strong> <strong>AEMR</strong>5.0 RehabilitationTable 5.1 provides a summary of the rehabilitationundertaken at WCPL during the <strong>2010</strong>-<strong>2011</strong>reporting period. Appendix 5 provides the annualrehabilitation plan for WCPL. Table 5.2 shows themaintenance activities conducted during <strong>2010</strong>-<strong>2011</strong>on previously rehabilitated land.Table 5.1 – Rehabilitation SummaryArea Affected/Rehabilitated (hectares)Current2009-<strong>2010</strong><strong>AEMR</strong>Next Report(estimated)A: MINE LEASE AREAA1 Mine Lease(s) Area 7050 7050 7050B: DISTURBED AREASB1 Infrastructure area (other disturbed areasto be rehabilitated at closure including facilities,roads)B2 Active Mining Area (excluding items B3-B5 below)B3 Waste Emplacements(active/unshaped/in or out-of-pit)B4 Tailings Emplacements(active/unshaped/uncapped)B5 Shaped Waste Emplacement (awaitsfinal vegetation)214.46 204.64 214.46148.57 96.12 223.47508.24 576.54 534.1440.39 40.39 40.390 81.12 0ALL DISTURBED AREAS 911.66 998.82 1012.46C1 Planned Rehabilitated Area 60 84.4 120C2 Total Rehabilitated Area (except formaintenance)249.6 263.8 309.6D1 10 to 18 degrees 4.3 4.3 4.3D2 Greater than 18 degrees 0.0 0.0 5.3E1 Pasture and grasses 206.31 220.91 351.31E2 Native forest/ecosystems 49.43 49.43 64.43E3 Plantations and crops 0.0 0.0 0.0E4 Other (include non vegetative outcomes) 0.0 0.0 0.0Page 82

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!