11.07.2015 Views

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Wambo</strong> <strong>Coal</strong> Pty Limited<strong>2010</strong>-<strong>2011</strong> <strong>AEMR</strong>No3435Date & TimeReceivedNature of Complaint7/06/<strong>2011</strong> Lighting24/06/<strong>2011</strong> Blast (noise/vibration)Action Taken By <strong>Wambo</strong>Community member called <strong>Coal</strong> & Allied Hunter Valley Operations (HVO) about lighting shining directly tohis residence. HVO investigated and passed on to <strong>Wambo</strong>. Upon investigation from <strong>Wambo</strong> personnel,lighting could be seen shining from <strong>Wambo</strong> Op’s across Golden Highway towards place of residence.<strong>Wambo</strong> personnel contacted Downer OCE on duty and had lights re-positioned. Map review indicatedsource to receiver was 8.25km at approx. 70 degrees. Inspection the following day made from RL 160dump indicated 2 lighting plants pointing towards complainant’s house with clear line visibility. Inspectionmade from vicinity of complainants house on evening of 09/06/<strong>2011</strong> – 2 RL160 dump lighting plants visible.Left hand lighting plant still very bright. Information passed onto DEDI, who stated they will realign lightingplants, and communicate requirement to night shift OCEsCommunity member called to lodge an enquiry via the Community Enquiry Line regarding excessivenoise/vibration from shot fired at <strong>Wambo</strong>. Investigation of the blast event did not record any blastexceedence as per consent conditions. Respondent was called and told of outcomes.Appendix 4: Register of Community Complaints

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!