11.07.2015 Views

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

aemc<strong>Wambo</strong> <strong>Coal</strong> Mine, Rail Loop and <strong>Coal</strong> LoaderIndependent Environmental Audit – Minister’s Condition of Approval5 Monitoring and recording conditionsM1 M1 Monitoring recordsM1.1 The results of any monitoring required to be conducted by thislicence or a load calculation protocol must be recorded andretained as set out in this condition.M1.2 All records required to be kept by this licence must be:(a) in a legible form, or in a form that can readily be reduced to alegible form;(b) kept for at least 4 years after the monitoring or event to whichthey relate took place; and(c) produced in a legible form to any authorised officer of the EPAwho asks to see them.M1.3 The following records must be kept in respect of any samplesrequired to be collected for the purposes of this licence:(a) the date(s) on which the sample was taken;(b) the time(s) at which the sample was collected;(c) the point at which the sample was taken; and(d) the name of the person who collected the sample.M2 Requirement to monitor concentration of pollutantsdischargedM2.1 For each monitoring/discharge point or utilisation area specifiedbelow, the licensee must monitor the concentration of eachpollutant specified in Column 1. The licensee must use thesampling method, units of measure, sample frequency, specifiedopposite in the other columns:Point 4Pollutant Units of Frequency SamplingmeasureMethodConductivityTotalsuspendedsolidsmicrosiemens/ centimetremilligrams perlitreContinuousduringdischargeDaily duringanydischargepH pH units ContinuousduringdischargePoint 5PollutantParticulates -DepositedMatterUnits ofmeasuregms/m 2 /mthFrequencyOnce/month(min. of 4weeks)Probe designedto measure 0 to10,000 uS/cmGrab sampleIn lineinstrumentationSamplingMethodAM-19 Environmental MonitoringProgram, 30 Jun 2006 Site Water Monitoring Program,Jan <strong>2010</strong>NotedYesYesYesAll monitoring results are retained by the Environment Sectionon site.All raw monitoring data is retained and archived by theEnvironment Section and is available on request.Monitoring records include the sampling point number, dateand time of collection.The Site Water Monitoring Program includes the monitoringpoints and parameters expressed in M2.1. Samples collectedare sent to a NATA registered Laboratory for analysis of thespecified parameters using approved standard methods.trevor brown & associates 113applied environmental management consultants

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!