11.07.2015 Views

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

aemc<strong>Wambo</strong> <strong>Coal</strong> Mine, Rail Loop and <strong>Coal</strong> LoaderIndependent Environmental Audit – Minister’s Condition of ApprovalThe Receiver Land Owner locations are as detailed in theEnvironmental Impact Statement titled “<strong>Wambo</strong> DevelopmentProject”, Volumes 1-5 dated July 2003 prepared by ResourceStrategies Pty Ltd.L6.3 Noise from the premises is to be measured at the most affectedpoint or within the residential boundary or at the most affected pointwithin 30m of the dwelling (rural situations) where the dwelling ismore than 30m from the boundary to determine compliance withthe LAeq(15 minute) noise limits in condition L6.1.Where it can be demonstrated that direct measurement of noisefrom the premises is impractical, the EPA may accept alternativemeans of determining compliance. The modification factorspresented in Section 4 of the NSW Industrial Noise Policy shallalso be applied to the measured noise levels where applicable.L6.4 Noise from the premises is to be measured at 1m from the dwellingfaçade to determine compliance with the L A(1 minute) noise limits incondition L6.1.L6.5 The noise emission limits identified in condition L6.1 apply undermeteorological conditions of: Wind speeds of up to 3m/s at 10 metres above ground level; or Tspeeds of up to 2m/s at 10m above the ground.L7 Blasting limitsL7.1 Blasting in or on the premises must only be carried out between0900 hours and 1700 hours, Monday to Saturday. Blasting in or onthe premises must not take place on Sundays or Public Holidayswithout the prior approval of the EPA.L7.2 The airblast overpressure level from blasting operations in or onthe premises must not exceed:(a) 115 dB (Lin Peak) for more than 5% of the total number ofblasts during each reporting period; and(b) 120 dB (Lin Peak) at any time.At any residence or noise sensitive location that is not owned bythe licensee or subject of a private agreement between the ownerof the residence or noise sensitive location and the licensee as toan alternative overpressure level . Noise Monitoring Program, May2007 Quarterly AttendedEnvironmental Noise MonitoringReports , <strong>Wambo</strong> <strong>Coal</strong> Mine andRail Spur Quarterly Attended NoiseMonitoring Reports , <strong>Wambo</strong><strong>Coal</strong> Mine and Rail Spur Quarterly AttendedEnvironmental Noise MonitoringReports , <strong>Wambo</strong> <strong>Coal</strong> Mine andRail SpurYesYesNotedYesNO120 dBLexceedancenoted in2008, 2009and <strong>2010</strong>The monitoring requirements are identified in the NoiseMonitoring Program 2007 and have been applied in thequarterly noise monitoring reports provided by Advitech andGlobal Acoustics for the monitoring locations and method ofmeasurement specified.This requirement is applied and monitoring locations aredescribed in the quarterly noise monitoring reports provided byGlobal Acoustics.These meteorological conditions are applied and described inthe quarterly noise monitoring reports provided GlobalAcoustics in relation to assessment of noise monitoring results.Blasting on the <strong>Wambo</strong> Mine site has only occurred between0900-1700 hours Monday to Saturday.Monitoring data has confirmed that blast overpressure levelsare generally in compliance with the criteria in L7.2:2007-2008: 4 of 109 blasts exceeded 115dBL (i.e. 3.6%)therefore compliant. No blasts exceeded 120dBL.2008-2009: 2 of 102 blasts exceeded 115 dBL (i.e. 2%)therefore compliant. One blast exceeded 120dBL (120.3dBL atKelly monitoring site on 13 October 2008) was reported toDECC.2009-<strong>2010</strong>: 2 of 62 blasts exceeded 115dBL (i.e. 5%)therefore compliant. One blast exceeded 120dBL criteria(122.1dBL at Harris monitoring site 14 August 2009) wasreported to DECCW.<strong>2010</strong>-June <strong>2011</strong>: One blast exceeded120dBL (i.e.124.2dBL atMuller monitoring site on 17 February <strong>2011</strong>) was reported toDECCW.trevor brown & associates 111applied environmental management consultants

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!