11.07.2015 Views

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

Wambo Coal AEMR 2010-2011 - Peabody Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

aemc<strong>Wambo</strong> <strong>Coal</strong> Mine, Rail Loop and <strong>Coal</strong> LoaderIndependent Environmental Audit – Minister’s Condition of Approval(c) the mass of pollutants emitted to the air;at the frequency and using the method and units of measure,specified below for Point 4.Frequency Unit Of Measure Sampling MethodContinuous megalitres per day In line instrumentationM7 HRSTS MonitoringM7.1 The licensee must continuously operate and maintaincommunication equipment which makes the conductivity and flowmeasurements, taken at Point 4 available to the “Service provider”within one hour of those measurements being taken and makesthem available in the format specified in the “Hunter River SalinityTrading Scheme Discharge Point Site Equipment” as published bythe Dept of Land and Water Conservation on 7 May 2002. Site Water Management Plan,<strong>2010</strong> Site Water Monitoring Program,Jan <strong>2010</strong>YesWCPL Point 4 discharge location has continuous onlineequipment installed for flow and conductivity measurementsduring discharge.Period of flow, volume discharged and conductivity ofdischarged water are available when releases to WollombiBrook occur and results are provided to the DECCW (OEH) inthe annual return for the EPL and HRSTS scheme reporting.Discharge records for Licence No. 0529 to the Hunter Riverbetween July 2005 and 1 June <strong>2011</strong> were:DischargePoint No.DateVolumeDischarged1 4 July 2005 5.0 ML1 5 July 2005 4.4 ML1 2007-2008 Nil4 1 April 2009 35.09 ML4 2 April 2009 22.874 3 April 2009 10.81 ML4 Apr 2009 to 30 Jun<strong>2010</strong>Nil discharge4 17 Nov <strong>2010</strong> 69ML4 18 Nov <strong>2010</strong> 34ML4 19 Nov <strong>2010</strong> 24MLM7.2 The licensee must ensure that all monitoring data is within amargin of error of 5% for conductivity measurements and 10% fordischarge flow measurement.M7.3 The licensee must mark monitoring point(s) number 4 with a signwhich clearly indicates the name of the licensee, whether themonitoring point is up or down stream of the discharge point(s) andthat it is a monitoring point for the Hunter River Salinity TradingScheme.YesYesCalibration of the conductivity and flow meters is conductedannually to ensure compliance with this requirement.The discharge point 4 has signage and is compliant with thisrequirement.trevor brown & associates 116applied environmental management consultants

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!