CONSTRUCTION COST <strong>AND</strong> PRODUCTIVITY IN <strong>PORT</strong> DEVELOPMENT<br />
Cost Estimation for Standardized Facilities<br />
The unit prices of the construction and the procurement of standardized facilities are<br />
estimated using past construction projects and cost estimations of other feasibility<br />
studies. The construction costs of each standardized facility per unit berth length (m) or<br />
unit wharf are summarized in the following tables:<br />
Table B.1<br />
Transshipment Type Port Terminal (-16 m Deep)<br />
Facilities Unit Dimension US$<br />
I. Infrastructure 30,500,000<br />
Berth Length m 350 17,500,000<br />
Depth m 16<br />
Terminal Area Marshalling Yard m 2 60,000<br />
CFS m 2 4,000,000<br />
Others m 2 40,000<br />
Earth Works Dredging m 3 1,000,000<br />
Reclamation m 3 100,000 9,000,000<br />
Slope Protection m 2 20,000<br />
II. Equipment 28,760,000<br />
Quay Crane 40t units 3<br />
Transfer Crane 40t units 12<br />
Side Lifter 40t units 4<br />
Tractor Head units 20<br />
Chassis units 40<br />
Forklift 5t units 8<br />
III. Management 4,090,000<br />
Office m 2 1,000<br />
Gate units 8<br />
Utilities LS 1<br />
IV. Related Facilities 5,000,000<br />
Access Road LS 1<br />
Pilotage LS 1<br />
Electric and Water Supply LS 1<br />
V. Total 68,350,000<br />