27.11.2012 Views

Technical Report No. 8 PORT AND SHIPPING

Technical Report No. 8 PORT AND SHIPPING

Technical Report No. 8 PORT AND SHIPPING

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3) Coastal Shipping (JICA), March 1997<br />

II-2-2<br />

Vietnam National Transport Strategy Study (VITRANSS)<br />

<strong>Technical</strong> <strong>Report</strong> <strong>No</strong>. 8<br />

Shipping and Ports<br />

Name of the study: Master Plan Study on Coastal Shipping Rehabilitation and<br />

Development Project in Vietnam<br />

Result of the study: The Master Plan includes:<br />

• Fleet expansion and modernization<br />

• Ports and waterways development<br />

− 17 key general coastal shipping ports: Hai Phong, Cai Lan, Hanoi, Vi Tri,<br />

Ninh Binh, Danang, Cua Lo, Ha Tinh-Quang Binh, Thuan An, Qui Nhon,<br />

Nha Trang, Saigon, Dong Nai, My Tho, Dang Thap, My Thoi, and Can<br />

Tho<br />

− A total of 710 km sea-cum-riverways<br />

• Coastal shipping management modernization<br />

• Secondary transport improvement program<br />

• Maritime human resources development program<br />

• Maritime safety enhancement and environment protection program<br />

Major recommendations:<br />

• The program on trunk route development for north-south coastal shipping<br />

should be developed.<br />

• The program to meet international requirements should be defined.<br />

• The program on maritime human resources development should be<br />

implemented at the earliest possible time.<br />

4) Central Ports (JICA), August 1998<br />

Name of the study: The Study on the Port Development Plan in the Key Area of<br />

the Central Region in the Socialist Republic of Vietnam.<br />

Result of the study: The Master Plan includes:<br />

• Chan May port: 1 multipurpose berth, 1 deep conventional berth, 5<br />

conventional berths<br />

• Lien Chieu port: 2 container berths, 1 multipurpose berth, 8 conventional<br />

berths<br />

• Dung Quat port: 2 deep tanker berths, 6 coastal tanker berths, 2 bulk berths,<br />

9 coastal vessel berths<br />

The initial stage includes:<br />

• Chan May port: 1 multipurpose berth, 2 conventional berths<br />

• Lien Chieu port: 1 multipurpose berth, 2 conventional berths<br />

• Dung Quat port: 1 deep tanker berth, 2 coastal tanker berths, 4 coastal<br />

vessel berths

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!