Table B.6<br />

Small Port (-5 m Deep)<br />

Facilities Unit Dimension US$<br />

I. Infrastructure 1,025,000<br />

Berth Pile-Deck m 80 480,000<br />

m 2 480<br />

Access Way Trestles m 50 270,000<br />

Courseway m 100<br />

Storage Open m 2 2,000 275,000<br />

Shed m 2 500<br />

II. Equipment 0<br />

III. Management 75,000<br />

Office LS 1<br />

Gate LS 1<br />

Utilities LS 1<br />

IV. Related Facilities 100,000<br />

Access Road LS 1<br />

Pilotage LS 1<br />

Electric and Water Supply LS 1<br />

V. Total 1,200,000<br />

Table B.7<br />

Dry Bulk Wharf (12 m Deep)<br />

Facilities Unit Dimension US$<br />

I. Infrastructure 5,750,000<br />

Berth Pier m 300 4,500,000<br />

Depth m 12<br />

Access Way Trestles m 100 750,000<br />

Courseway m 2 300<br />

Earth Works Dredging m 3 100,000 500,000<br />

Reclamation m 3<br />

Slope Protection m 2<br />

II. Equipment 2,000,000<br />

Loading/Unloading Ls 1<br />

III. Management 100,000<br />

Office LS 1<br />

Gate LS 1<br />

Utilities LS 1<br />

IV. Related Facilities 1,000,000<br />

Access Road LS 1<br />

Pilotage LS 1<br />

Electric and Water Supply LS 1<br />

V. Total 8,850,000<br />

B-5