- Page 1 and 2: Japan International Cooperation Age
- Page 3 and 4: PART I: SHIPPING Technical Report N
- Page 5: Glossary ADB Asian Development Bank
- Page 9 and 10: I-2-1 Vietnam National Transport St
- Page 11 and 12: 2.2 Ongoing and Committed Projects
- Page 13 and 14: I-2-5 Vietnam National Transport St
- Page 15 and 16: 3 CURRENT SITUATION 3.1 Administrat
- Page 17 and 18: I-3-3 Vietnam National Transport St
- Page 19 and 20: 3.2 Industrial Framework Vietnam Na
- Page 21 and 22: I-3-7 Vietnam National Transport St
- Page 23 and 24: Table 3.2.1 continued I-3-9 Vietnam
- Page 25 and 26: I-3-11 Vietnam National Transport S
- Page 27 and 28: Owner Type 10000 ALL DWT % State 9
- Page 29 and 30: I-3-15 Vietnam National Transport S
- Page 31 and 32: I-3-17 Vietnam National Transport S
- Page 33 and 34: I-3-19 Vietnam National Transport S
- Page 35 and 36: I-3-21 Vietnam National Transport S
- Page 37 and 38: I-3-23 Vietnam National Transport S
- Page 39 and 40: 3.4 Safety Enhancement and Environm
- Page 41 and 42: Recent Undertakings Box 3.4.1 Port
- Page 43 and 44: I-3-29 Table 3.4.4 Accession Status
- Page 45 and 46: VM Petroleum Standing Committee Fig
- Page 47 and 48: I-4-2 Vietnam National Transport St
- Page 49 and 50: I-4-4 Vietnam National Transport St
- Page 51 and 52: I-4-6 Vietnam National Transport St
- Page 53 and 54: Passenger Ship Cargo Ship (3) Chart
- Page 55 and 56: Introduction I-4-10 Vietnam Nationa
- Page 57 and 58:
Figure 4.2.1 Historical Scale-up of
- Page 59 and 60:
I-4-14 Vietnam National Transport S
- Page 61 and 62:
I-4-16 Vietnam National Transport S
- Page 63 and 64:
5 SHIPPING DEVELOPMENT STRATEGIES 5
- Page 65 and 66:
I-5-3 Vietnam National Transport St
- Page 67 and 68:
I-5-5 Vietnam National Transport St
- Page 69 and 70:
I-5-7 Vietnam National Transport St
- Page 71 and 72:
Table 5.3.2 Fleet Development plan
- Page 73 and 74:
I-5-11 Vietnam National Transport S
- Page 75 and 76:
1 INTRODUCTION II-1-1 Vietnam Natio
- Page 77 and 78:
3) Coastal Shipping (JICA), March 1
- Page 79 and 80:
6) HCMC (United Kingdom), January 1
- Page 81 and 82:
2.3 Government Plan and Policy Deve
- Page 83 and 84:
3 CURRENT SITUATION 3.1 Port Admini
- Page 85 and 86:
II-3-3 Vietnam National Transport S
- Page 87 and 88:
Figure 3.2.1 Ports in Vietnam II-3-
- Page 89 and 90:
Box 3.3.1 Required Water Depth as F
- Page 91 and 92:
Source: VINAMARINE Annual Report in
- Page 93 and 94:
ton ton ton ton II-3-11 Vietnam Nat
- Page 95 and 96:
3.5 Finance and Management Role of
- Page 97 and 98:
Table3.5.2 Estimated Capital Invest
- Page 99 and 100:
4 DISCUSSIONS ON KEY PLANNING ISSUE
- Page 101 and 102:
4.2 Future Development Requirements
- Page 103 and 104:
(3) Empty Container Ratio II-4-5 Vi
- Page 105 and 106:
Table 4.2.7 Port Capacity by Cargo
- Page 107 and 108:
II-4-9 Figure 4.3.1 Location of Hai
- Page 109 and 110:
4.4 Other Key Issues 1) Port Hierar
- Page 111 and 112:
II-4-13 Vietnam National Transport
- Page 113 and 114:
Table 4.4.4 Weekly Loading Plan for
- Page 115 and 116:
5 PROPOSED PORT DEVELOPMENT (2001-2
- Page 117 and 118:
Table 5.1.4 Port Hinterland by Prov
- Page 119 and 120:
Table 5.1.9 Port Traffic in Souther
- Page 121 and 122:
Table 5.2.5 Required Capacity up to
- Page 123 and 124:
5.3 Identified Projects for the Mas
- Page 125 and 126:
II-5-11 Vietnam National Transport
- Page 127 and 128:
(6) Nha Trang Port Development II-5
- Page 129 and 130:
(2) Ho Chi Minh City General Ports
- Page 131 and 132:
Figure 5.3.1 Development Plan of Ca
- Page 133 and 134:
Dung Quat Figure 5.3.5 Development
- Page 135 and 136:
Figure 5.3.9 Development Plan of Po
- Page 137 and 138:
II-5-23 Vietnam National Transport
- Page 139 and 140:
The tentative investment schedule i
- Page 141 and 142:
APPENDIX A DETAILED PORT DEVELOPMEN
- Page 143 and 144:
(Table A.1 continued) No. Name Pres
- Page 145 and 146:
(Table A.1continued) Present status
- Page 147 and 148:
Table A.2 Investment Capital for Po
- Page 149 and 150:
Table B.2 Intra-Asia Container Port
- Page 151 and 152:
Table B.4 Multipurpose Wharf for Co
- Page 153:
Notes: Planning base year is 2020.